Generated by All in One SEO v5.0.0.1, this is an llms.txt file, used by LLMs to index the site. # Neeser Construction Inc Neeser Construction has the resources to make your project a success and the ability to build your dream into a reality. ## Sitemaps - [XML Sitemap](https://www.neeserinc.com/sitemap.xml): Contains all public & indexable URLs for this website. ## Posts - [Projects](https://www.neeserinc.com/projects/) - This is a chronological list of all of the construction projects we have been a part of. - [188 W. Northern Lights Blvd.](https://www.neeserinc.com/188-w-northern-lights-blvd/) - The 188 West Northern Lights Building is a 293,000 sq. ft. fifteen-story building that combines 145,000 sq. ft. on four levels of parking, 15,000 sq. ft. of ground level retail space, and 133,000 sq. ft. (nine floors) of Class A office space. The building is located on the corner of Northern Lights Blvd and "C" - [Santos Alaska TI](https://www.neeserinc.com/santos-alaska-ti/) - Tenant improvement of 87,031 SF of space form L3 to L 9 for Oil Search (Alaska), LLC a subsidiary of Santos Limited with following building area at each level: Following the renovation and modernization to the existing Key Bank building, a single tenant, Santos, implemented an interior build-out of seven complete floors, levels 3 – - [601 West 5th Avenue](https://www.neeserinc.com/601-west-5th-avenue/) - The project entailed repair, renovation, modernization, and addition to the existing Key Bank building (built in 1972). The building ‘s structure was reworked to meet current seismic codes, which included new mass concrete foundations and steel BRB lateral bracing. To the southeast new floor plates were added on all floors, adding 40,000sf of floor space - [Building 3030 Structural Repairs](https://www.neeserinc.com/building-3030-structural-repairs/) - Design-Build by Neeser Paug-Vik, JV under SBA Mentor Protégé agreement. Identify areas of structural deficiency to include decking, purlins, beams, columns and connections along the load path relative to current snow loads as one section was built in 1954. All work occurred on under side to not disturb existing roof or flooring. Warehouse was occupied - [The Marlette](https://www.neeserinc.com/the-marlette/) - 140-unit, garden-style, multifamily development. The complex is being developed on a 6.1-acre site. The community will feature 10 two-story buildings, each with 14 units, a 3,000 square-foot clubhouse, leasing office, fitness center, dog park, a playground, and a swimming pool area complete with cabanas, firepit seating, and an outdoor kitchen for resident use. The community - [Wasilla Airport - Expand Apron E](https://www.neeserinc.com/wasilla-airport-expand-apron-e/) - Expand Apron E at the Wasilla Municipal Airport @ approximately 230,000 SF apron. - [E Smith Road](https://www.neeserinc.com/e-smith-road/) - The project is located east of the Old Glenn Highway on East Smith Road Extension beginning at the intersection of North Smith Road and extending approx 4600 ft to the eastern termination at North Kendy Circle and the McRoberts & Matanuska Peak trailhead . To provide improved and safer residential and recreational trailhead access through - [Edgerton Parks Road & Mountain Trails Drive Upgrade](https://www.neeserinc.com/edgerton-parks-road-mountain-trails-drive-upgrade/) - This project is to install new pathway and roadway improvements to improve accessibility near Government Peak Trailhead. The project involves, clearing, grubbing, excavation, import and placement of borrow material, placement and backfill of geotextile, geocell, and geogrid, import and placement of aggregate base and surface courses, placing hot mix asphalt, installing drainage culverts, placement of - [Birch Hill Snowmaking](https://www.neeserinc.com/birch-hill-snowmaking/) - By Neeser Paug-Vik, JV under SBA Mentor Protégé agreement. New snowmaking equipment and repairs. The JV teamed with SMI Snowmakers for design and manufacture the tower and gun equipment and supply technical oversight and support for installation and to outsource the pumphouse equipment to Torrent Engineering. Thereafter the owner decided to do all the design - [East 16th Ave Storm Drain Improvements](https://www.neeserinc.com/east-16th-ave-storm-drain-improvements/) - Consisting of approximately 2,270 L.F. of Storm Pipe Removal and Replacement; 17 new storm drain structures; 1 Vortechs Model 11000 oil and grit separator; approximately 1,040 tons of Pavement; and other related work. - [Becharof, Rakof to Chirikof Water Rehab](https://www.neeserinc.com/becharof-rakof-to-chirikof-water-rehab/) - decommissioning by combination of removal and abandon in place 303 linear feet (LF) of 6-inch and 8-inch cast iron water main, 571 LF of 8-inch asbestos concrete water main and appurtenances, nine (9) ¾” water services and key boxes, and one fire hydrants; furnish and install approximately 1836 LF of 8-inch polyvinyl chloride (PVC) pipe, - [Campbell Creek Trail & Bridge Improvement Phase 5](https://www.neeserinc.com/campbell-creek-trail-bridge-improvement-phase-5/) - Improvements from 57th Place to Fairbanks spur Trail. Approx 424 SY remove pavement, 660 CY of usable excavation, 620 T of classified back-fill Type IIA, 1110 CY classified fill Type III, 80 T leveling course, 225 CY of Riprap Class II, 790 SY of Geo textile, 16 CY of P.C.C. Structures decking, 2 helical pier - [Bering Strait School District](https://www.neeserinc.com/bering-strait-school-district/) - Gambell K-12 School - This design-build project called for an addition of 32,000 sq. ft. to the existing 11,000 sq. ft. high school. Extreme weather conditions, the worst Alaska has to offer, required an innovative approach to a fast-track enclosure of the structure. NCI accomplished this by combining a structural steel main frame system with - [Reno Element Hotel by Marriott](https://www.neeserinc.com/reno-element-hotel-by-marriott/) - The project scope is a new mixed-use ground up Marriott Element Hotel consisting of 170 guestrooms total in 5 stories. The Marriott Element Hotel consists of a meeting room, motion center, dinning/breakfast area, full service kitchen, laundry, rooftop pool, spa with deck and a 1 story adjacent 6,404 SF restaurant. - [Complementary Medicine Building](https://www.neeserinc.com/complementary-medicine-building/) - This project consists of remodeling an existing three story 35,409 SF building located at 4201 Tudor Center Dr., Anchorage, AK. Work includes demolition of existing entry and building a new entry including a little concrete work; demolition of existing interior partitions and constructing new partition walls. Work also includes some new aluminum storefront and windows, - [The Children's Dental Clinic](https://www.neeserinc.com/the-childrens-dental-clinic/) - This 36 chair children's dental clinic was constructed in the Alaska Native Health Campus in Anchorage, Alaska. The initial concept includes a basement and two upper floors, each projected to be about 18,000 square feet for a total of 54,000 square feet. The basement will include utilities, mechanical and electrical, field storage, bulk storage, loading - [Black Rapids Ski Chalet](https://www.neeserinc.com/black-rapids-ski-chalet/) - SATOC awarded to Neeser Paug Vik, JV, LLC under the SBA 8(a) program. Design-build and Design-Bid-Build construction (vertical and horizontal), for projects located primarily throughout Alaska & Hawaii. Demolish existing wood framed structure, Northern Warfare Training Center, Black Rapids Training Site, Alaska. Bldg. 2032. Prepare site to for new structural building slab on grade and - [Chapel by the Sea](https://www.neeserinc.com/chapel-by-the-sea/) - Work included demolition of the old Fellowship Hall, making room for construction of a modern 10,650 SF Christian Education Center with enclosed areas for K-12 classrooms with food service, recreational and meeting spaces. The new structure has cast-in-place concrete foundations, an under-slab water vault and fire pump for the new fire suppression system, and a - [4th Ave. Signal & Lighting Phase 2](https://www.neeserinc.com/4th-ave-signal-lighting-phase-2/) - Consisting of approximately 6,000 S.Y. of Sidewalk and Concrete Apron Removal and Replacement; 30 each of Curb Ramps; 3,400 L.F. of Curb and Gutter Removal and Replacement; 1,900 Tons of A.C. Pavement; 9,000 S.Y. of Pavement Removal; 9 Catch Basins; 10 Storm Drain Manholes; 1,000 L.F. of Storm Pipe Removal and Replacement; 3 Traffic Signals; - [AMATS: Chugiak Foothills Connector, Ph. II](https://www.neeserinc.com/amats-chugiak-foothills-connector-ph-ii/) - This federally funded project will construct a multi-use path along Tudor Road between Regal Mountain Drive and Campbell Airstrip Road. Project work includes grading, pathway, boardwalk and signing. - [The Shops at Seritage](https://www.neeserinc.com/the-shops-at-seritage/) - This ongoing job is NCI’s 3rd project for Seritage over past years and involves demolition, reconstruction and upgrades to replace the core & shell of the recently closed Sears store in the Anchorage Sears mall. Through collaboration with Seritage and its design team, NCI was able to establish reasonable budgets and schedules and is on - [Alert Holding and Pallet Processing](https://www.neeserinc.com/alert-holding-and-pallet-processing/) - The Alert Holding and Pallet Processing Facility (AHPP) was one of several Task Orders issued to NCI under a five year Multi-Award Task Order Contract with the USACE. AHPP is a complex that consolidates the "at ready" tasks of the rapid deployment Stryker Brigade. Mobilization, pre-weighed load building, fueling, warehousing (from small arms rounds to - [Home Depot Store #8940](https://www.neeserinc.com/home-depot-store-8940/) - This South Anchorage Home Depot store was a fast-track project. The property is contiguous to a Safeway Store, so NCI, as the developer, had to meet Safeway's requirements for access and appearance in addition to Home Depot's criteria. The assemblage of property started in late 2002, with the first purchase of land in July 2003. - [Aero Parking](https://www.neeserinc.com/aero-parking/) - The project is located 2 miles south of the Seattle-Tacoma International Airport on the north side of 208th Street, west of the International Blvd. in the City of Sea Tac, Washington. Project consists of ground lease improvements to create a 842 stall valley parking lot situated on two land parcels containing 213,179 square feet. The - [Goose Creek Correctional Center](https://www.neeserinc.com/goose-creek-correctional-center/) - Neeser Construction, Inc (NCI) recently completed a $223 million Design-Build contract with the Matanuska-Susitna Borough for the Goose Creek Correctional Center. Jerry Neeser began assembling a top-notch design team almost two years prior to the issuance of the RFP. This foresight enabled NCI and its design team to establish a work plan for approaching the - [Sam's Club - Store 6602-08](https://www.neeserinc.com/sams-club-store-6602-08/) - Sam's Club is a 145,000 square foot building that consists of seven loading docks, four truck bays. A large sales floor for grocery, liquor, store bakery, snack bar, tire battery center. The main building consists of CMU Block, Structural Steel and has EIFS and paint. The lot will include a fuel station to the west - [Alaska Military Youth Academy Bus Shelter](https://www.neeserinc.com/alaska-military-youth-academy-bus-shelter/) - The project consists of Designing and Constructing a 8,250 SF Bus Barn Shelter: Construction to be a per-engineered metal building with a metal roof on a piling foundation: The sides are to remain open. Installation of LED light fixtures. - [Sierra Biofuels Plant](https://www.neeserinc.com/sierra-biofuels-plant/) - www.neeserconstruction.com Design and build of Water Treatment tank pads and sumps - [Aluutiq Aviation Building](https://www.neeserinc.com/aluutiq-aviation-building/) - Demolition and disposal of the existing building, slabs and foundations, excluding the costs for hazardous material abatement. Excavation for new foundation, backfill for foundation and preparation for slab, asphalt patching, new 6" water service into the building, trenching for sewer and trench drain/oil water separator system. Concrete, building frame, siding and roofing. Steel stud framing, - [Camp K Upper Development](https://www.neeserinc.com/camp-k-upper-development/) - Civil construction for a new septic system and site work for 3 new cabins, a new bathhouse and nature center buildings including piling. - [VMC-D&T Ph2](https://www.neeserinc.com/vmc-dt-ph2/) - The project consists of selective demolition and renovation to the existing IRCU department at the main Valley Medical Center Hospital located in Renton, Washington. The size is approximately 10,000 square feet. The TI scope includes a Hybrid OR suite, a Bi-plane and a Cath Lab with supporting equipment rooms and work rooms. The project also - [Valley Medical Road Upgrades](https://www.neeserinc.com/valley-medical-road-upgrades/) - C- Scope of work includes a new intersection with traffic signals with provision for left turn lane from Talbort Rd S., north bound onto N. Campus Rd and left turn lane from N. Campus Rd onto Talbot Td S. going North Bound, designated bike lane and dedicated right turn lanes on new North Rd and - [Valley Medical Pavilion](https://www.neeserinc.com/valley-medical-pavilion/) - Construct a 5 story approximately 145,000 sq ft medical office building on the Valley Medical Hospital Campus - [Fish Creek Trail Rehab](https://www.neeserinc.com/fish-creek-trail-rehab/) - Federally funded contract will reconstruct the Fish Creek Trail to include trail rehabilitation, bridge and retaining wall replacement, illumination and signage - [4th Ave. Signal & Lighting](https://www.neeserinc.com/4th-ave-signal-lighting/) - Consisting of approximately 1,657 S.Y. of Sidewalk and Concrete Apron Removal and Replacement; 21 curb ramps; 1,232 L.F. of Curb and Gutter Removal and Replacement; 1,047 Tons of A.C. Pavement; 3,825 S.Y. of Pavement Removal; 6 Catch Basins; 1 Storm Drain Manhole; 188 L.F. of Storm Pipe Removal and Replacement; Replacement of 2 complete signal - [Emory Parking Structure](https://www.neeserinc.com/emory-parking-structure/) - www.neeserconstruction.com Lyon Living tasked Neeser Construction with the Design&Build of this 324 stall parking structure in advance of the Residential Wrap (Emory) which would surround it. The concept was to start the parking structure early so there would be less interference with the residential. The design did include the future expansion of one floor which - [Emory @ R.E.D.](https://www.neeserinc.com/emory/) - www.neeserconstruction.com The project as designed was 232 residential units with ground floor commercial and the usual amenities. The structure was five story type 3, wood construction with spread footings. Neeser Construction bid the project and was the low bidder. However, the bid was higher than the required budget required by the owner to make it - [Image Drive-Reflection Drive](https://www.neeserinc.com/image-drive-reflection-drive/) - Consisting of approximately 17,085 C.Y. of Excavation; 27,237 Tons of Classified Fill and Back fill; 2,710 L.F. of Curb and Gutter Removal; 6,871 S.Y. of Pavement Removal; 820 Tons A.C. Pavement; 2,713 L.F. Curb and Gutter Installation; 7 Curb Ramp Installations; 63,000 S.F. Insulation Installation (R-9); 4,950 S.F. Insulation Installation (R-4.5); 913 S.Y. P.C.C. Sidewalk - [Fisher House Kansas City Veterans Administration Hospital](https://www.neeserinc.com/fisher-house-kc/) - New construction of a Fisher House residential guest house in Kansas City. The building is a 2-story wood framed structure with brick siding, with 16 beautifully furnished guest suites, public kitchen, dining room and living room areas. The site work, building construction, finishes, and landscaping were based on design by the Owner’s design team, led - [Dena'ina Wellness Center](https://www.neeserinc.com/denaina-wellness-center/) - The Dena’ina Wellness Center is a 52,000 square foot outpatient medical clinic located in Kenai, Alaska. The facility, located on a brownfield site in “Old Town” Kenai, is set to achieve LEED Silver certification. This facility was designed and constructed to an architectural and cultural standard previously not found in the region, incorporating many elements - [Klahowya Secondary School](https://www.neeserinc.com/klahowya-secondary-school/) - Construction of a new 44,105 SF addition of an occupied school site. This project features 13 permanent classrooms, 3 labs, an auxiliary gymnasium and fitness classroom. It also includes a secure entry way, athletic field improvements, including synthetic turf field and track renovation with improved field access for those with disabilities. - [TSAIA Runway 25R](https://www.neeserinc.com/tsaia-runway-25r/) - This federally funded project will construct improvements to drainage around the east Runway Safety Area (RSA) of Runway 7L/25R, prevent ponding east of the existing tug road which is a wildlife attractant, reconstruct the RSA to meet FAA standards, remove and install FAA Fiber Optic duct bank, remove obstructions, and install fencing. - [Willow House](https://www.neeserinc.com/willow-house/) - Clear grub and remove former development conditions; installation of deep utilities, and fire hydrants with water lines from the water main; excavation of the building footprint and removal of unsuitable soils; back fill with usable soils to the building foundation level; excavation of the driveway entrance, onsite driveways/roadways and parking lot area to the required - [Public Health Lab & Medical Examiners Facility](https://www.neeserinc.com/public-health-lab-medical-examiners-facility/) - This is a 37,000 sq. ft. concrete and steel structure housing extensive environmental health laboratory facilities as well a coroner's lab and servicing area. It is a very complex structure due to its need to accommodate state-of-the-art exhausting systems with the associated mechanical systems. - [Mountain View Community Center](https://www.neeserinc.com/mountain-view-community-center/) - The Mountain View Community Center design-build project created a community center in the truest sense of tradition. Set in the middle of Mountain View, in an established Anchorage neighborhood, the center serves the rich cultural diversity that is found only in this part of the city. The ethnic make-up of the community demands a facility - [Military Entrance Processing Station](https://www.neeserinc.com/military-entrance-processing-station/) - This project involved the design and construction of a 40,000 sq. ft., two-story steel and concrete commercial office building. The building consists of medical, exam, X-ray, testing, and lab facilities, a computer room, ceremony room, kitchen, and general office support, as well as 20,000 sq. ft. of covered parking that makes up the ground floor. - [Bridges At Victorian Square](https://www.neeserinc.com/bridges-at-victorian-square/) - The key to this project was the Re-Design / Build Parking Structure where we save the owner over $1 million after our redesign and performed all of the forming and concrete work with our own in-house workforce. The project consists of two poured in place concrete parking structures with apartment units on top of each. - [Vintage Senior Housing](https://www.neeserinc.com/vintage-senior-housing/) - Demolition of the existing structures and new construction of a 4-story facility of approximately, 230,000 square foot senior living facility with 230 residential apartments and a connected clubhouse/activity center that also houses the administrative and operations offices. The apartments are a mix of 1 and 2 bedroom units. - [Shaw Road Elementary Addition](https://www.neeserinc.com/shaw-road-elementary-addition/) - General construction for a 16,900 SF wood framed, single story, 12 classroom addition to the existing elementary school site. The work includes a 2,000 SF mechanical mezzanine on a framed mechanical platform in the pitched roof attic space. The project includes a new playground, with associated playground equipment, site work and landscaping. - [The Deco](https://www.neeserinc.com/the-deco/) - www.neeserconstruction.com Unique reuse of existing parking structure, by designing and structurally improving an existing cast-in-place parking structure by expanding existing footings and grade beams and adding a podium deck at 51’ above ground level to support 6 stories (230 units) of light gauge steel framed residential apartments. - [Missile Field 4 Infrastructure](https://www.neeserinc.com/missile-field-4-infrastructure/) - This project is for the construction of the FTG218D MF4 Construction Package #04 (CP#04) which includes all of the infrastructure associated with Missile Field 4 (excluding MEB 4) to include; SILO Liners, SILO Foundations, SIV Foundations, Utilidors and associated piping. A and B shielded power duct bank and cabling, A&B communications duct bank and cabling, - [ANTHC Patient Housing and Sky Bridge](https://www.neeserinc.com/anthc-patient-housing-and-sky-bridge/) - Provide materials, tools, equipment, supplies, parts, labor, freight, transportation, mobilization, and demobilization, and supervision necessary to construct a six level, 202 room patient housing unit, and sky bridge to connect the housing unit to the Alaska Native Medical Center. - [USACE COVID-19 Alternate Care Facility](https://www.neeserinc.com/usace-covid-19-alternate-care-facility/) - Convert the Alaska Airlines Arena into an Alternate Care Facility in order to achieve a “sufficiency of care” model meeting critical elements of healthcare for an infectious COVID-19 patient based on requirements of NFPA 99 Space Category 2 (General Care). Category 2 is defined by the NFPA 99 as “activities, systems, or equipment whose failure - [Alaska Village Senior & Creekview Plaza Housing Project](https://www.neeserinc.com/alaska-village-senior-creekview-plaza-housing-project/) - Construction of three each three story buildings for a total of 56 senior and family residential unites and retail space including site-work and alternative energy systems. - [Anchorage Rental Car Center](https://www.neeserinc.com/anchorage-rental-car-center/) - The Anchorage Rental Car Center, located at Ted Stevens International Airport, was a design-build project by NCI that originated through an innovative development process initiated by Venture Development Group. The 540,000 sq. ft. facility is situated directly in front of the airport's main terminal; it is connected to the terminal by an underground tunnel link - [Glenn Highway Muldoon Road Interchange](https://www.neeserinc.com/glenn-highway-muldoon-road-interchange/) - This state funded project will reconstruct the existing Glenn-Muldoon partial cloverleaf interchange into a diverging diamond configuration including reconstruction of the Glenn Hwy on/off ramps and reconstruction of Muldoon Road from Boundary Ave. to Golden Bear Drive. Associated improvements include new pedestrian pathways, illuminations, noise walls, water line relocating, landscaping and drainage modifications. - [Fisher House II Joint Base Elmendorf Richardson](https://www.neeserinc.com/fisher-house-ii-joint-base-elmendorf-richardson/) - The site work, building construction, finishes, and landscaping were based on the Owner's design of this two level 12,300 square foot, 16 bedroom guest house for use by service members and/or their families, free of cost, while recuperating from injury or illness. The entire project was fully funded by private donations and provides a luxurious - [HSIP Anchorage Area Safety](https://www.neeserinc.com/hsip-anchorage-area-safety/) - This federally funded contract will provide intersection safety improvements at numerous locations throughout Anchorage. Work includes channelization and signing, curb bulb installations, sight distance improvements, and signal pole/signal arm relocation in addition to repaving. - [Hostetler Park](https://www.neeserinc.com/hostetler-park/) - Hostetler Park is located where Third Avenue becomes L Street. Since 1994, the eastern portion of the park has been occupied by the Alaska Victims Memorial. It includes the names of more than 350 Alaskans who died because of a violent crime, whether it was through homicide or a drunk driving crash. The Rotary Club - [Fisher House Keesler AFB](https://www.neeserinc.com/fisher-house-keesler-afb/) - New construction of a Fisher House residential guest house at Keesler AFB. The building is a 2-story wood framed structure with brick siding, with 16 guest suites and public kitchen, dining room and living room areas. The site work, building construction, finishes, and landscaping were based on the Owner's design of this two level 12,300 - [Wolf Run East Student Housing](https://www.neeserinc.com/wolf-run-east-student-housing/) - Wolf Run East Student Housing Project consists of seven 3 story buildings on 4.15 acres. Each building has 15 apartments. The apartment floor plans consist of twenty-one 3 bedroom units, sixty-three 2 bedroom units and twenty-one 1 bedroom units totaling 210 rental units. Some of the buildings have two ADA handicap accessible apartments located on - [SCF 2 North Primary Care Center](https://www.neeserinc.com/scf-2-north-primary-care-center/) - The SCF 2 North Primary Care Clinic Remodel is a two-phase tenant improvement project on the SCF main campus in Anchorage, Alaska. The scope includes approximately 20,000 SF of comprehensive renovation of the second floor of the Primary Care Clinic. The two phases of work are: Phase 1 – Renovate Administration Area West of Grid - [Trunk Road Extension South Phase 2](https://www.neeserinc.com/trunk-road-extension-south-phase-2/) - Construct the second phase of Trunk Road South from the existing asphalt south of the new roundabout to the existing Nelson road widening just before Fetlock Drive intersection. Grading, drainage, guardrail, paving, and striping, and other miscellaneous items of work will be done as necessary - [Alutiiq Center](https://www.neeserinc.com/alutiiq-center/) - The Alutiiq Center is a 72,000 sq. ft., five-story class 'A' office building supported by a 56,000 sq. ft., 170-stall parking structure on the same site. The Afognak Native Corporation (ANC) had expanded operation such that they needed a sufficiently sized headquarters building located in Anchorage. The headquarters campus began through discussions between ANC and - [Nordstrom Rack / Sears Remodel](https://www.neeserinc.com/nordstrom-rack-sears-remodel/) - The renovation and consolidation of the existing Sears store located on the New Seward Highway at the Mall at Sears to make room for a Nordstrom Rack retail outlet store. The project consists of demo and seismic upgrades of the north 34,900 square foot of the existing Sears store. The addition of new interior tenant - [New Williwaw Elementary School](https://www.neeserinc.com/new-williwaw-elementary-school/) - This was a unique project for the Anchorage School District that involved purchasing a new 15-acre location and building a 56,000 sq. ft., 26-classroom elementary school in Anchorage for a lump sum, in exchange for the old school building and site that the new school would replace. The construction involved a combination of steel frame - [Fisher House Joint Base Elmendorf Richardson](https://www.neeserinc.com/fisher-house/) - The Fisher House project was a negotiated, design-assist new construction project for the Fisher House Foundation, built in Anchorage, AK. The Fisher House Foundation is a private, non-profit charitable organization headquartered in the Rockville, MD, dedicated to donating these guest house facilities to the US Armed Forces, at US military and VA hospitals throughout the - [Fisher House II Joint Base Lewis McCord](https://www.neeserinc.com/fisher-house-ii-joint-base-lewis-mccord/) - The JBLM Fisher House 2 project was a negotiated, design-assist new construction project for the Fisher House Foundation, built on base at Joint Base Lewis-McChord in Tacoma, WA. The Fisher House Foundation is a private, non-profit charitable organization headquartered in the Rockville, MD, dedicated to donating these guest house facilities to the US Armed Forces, - [The Salvation Army Eagle River Family Store](https://www.neeserinc.com/the-salvation-army-eagle-river-family-store/) - Tenant Improvements in approximately 24,000 square feet - [UAA - Engineering Computational Building and Parking Garage](https://www.neeserinc.com/uaa-engineering-computational-building-and-parking-garage/) - The work consists of construction of a new four story post-tensioned concrete parking structure at the corner of Mallard Drive and UAA Drive. The structure will be approximately 485 parking spaces and have a foot print of 196 feet by 232 feet. The structure will also include a new enclosed stair structure and pedestrian bridge - [Grass Creek North, Phase I](https://www.neeserinc.com/grass-creek-north-phase-i/) - Construct eight (8) tri-plex and two (2) four-plex townhome style buildings, one (1) three story twenty-unit multifamily building for a total of fifty-two (52) units and associated civil work for Phases I and II on the corner of Creekside Center Drive and Muldoon Road in Anchorage, Alaska. - [TIA Taxiway Y&K Safety Area Widening](https://www.neeserinc.com/tia-taxiway-yk-safety-area-widening/) - This federally funded project will widen safety areas for Taxiways Y and K to meet FAA standards for ADG VI aircraft. - [Fish Creek Sewer Rehab Ph. III](https://www.neeserinc.com/fish-creek-sewer-rehab-ph-iii/) - This contract consists of the removal of existing 8" concrete (CN) sewer pipe and replacement with approximately 416 linear feet of Contractor furnished and installed 8-inch PVC pipe, and rehabilitation of 5 CMP manholes with contractor furnished and installed fiberglass manhole inserts, frames, and watertight covers. The work also includes installation and removal of temporary - [ANTHC Healthy Communities Building Remodel](https://www.neeserinc.com/anthc-healthy-communities-building-remodel/) - Create additional clinical space to meet the needs of ANMC's patient population by remodeling two floors of the Healthy Communities Building to accommodate the growing needs of the Internal Medicine Clinic, Podiatry Clinic, Oncology Clinic, and the Infusion Center. The remodeled areas will provide clinical examination and treatment rooms, clinic support, public areas, and staff - [The Salvation Army S.A.F.E. Campus](https://www.neeserinc.com/mckinnell-house-cares-for-kids/) - In 2002, The Salvation Army approached NCI and explained their desire to improve their services for displaced two-parent families and single fathers. What began as a few questions became a mission for Jerry Neeser that involved over five years of working hand-in-hand with the local Salvation Army administration. Together they had to find the land, - [The Salvation Army Community Center](https://www.neeserinc.com/salvation-army-community-center/) - The facility is the third component of the S.A.F.E. Campus. It houses a Chapel, gymnasium, commercial kitchen, classrooms, offices and administrative space as well as various auxiliary areas necessary to support the facility. There were multiple rounds of estimating, value engineering and budget reconciliation within the early design phase of the contract. NCI developed several - [DPS Alaska Scientific Crime Detection Laboratory](https://www.neeserinc.com/dps-alaska-scientific-crime-detection-laboratory/) - This project is an 84,000/SF, 3-story Scientific Crime Detection Laboratory. The contract was met through a 2 step CM/GC delivery method. NCI provided pre-construction services throughout the design phases. The pre-construction services included construct-ability reviews and clash detection, value engineering, and schedule and cost controls. The crime detection laboratory project is a highly complex facility - [Fisher House Vancouver Campus of Portland Veterans Administration Hospital](https://www.neeserinc.com/fisher-house-vancouver-campus-of-portland-veterans-administration-hospital/) - The VAMC Fisher House project was a negotiated, design-assist new construction project for the Fisher House Foundation, built on the VA hospital campus at Vancouver, WA, adjacent to the Vancouver VA Medical Center. The Fisher House Foundation is a private, non-profit charitable organization headquartered in the Rockville, MD, dedicated to donating these guest house facilities - [Orthopedic Physicians Alaska Addition and Remodel](https://www.neeserinc.com/orthopedic-physicians-alaska-addition-and-remodel/) - This contract demos and remodels the 26,000 square feet of existing first floor space into a new Ambulatory Surgery Center, with a new ground addition of 2,000 square feet for new Entries, Elevators, and Mechanical space plus a Core & Shell addition of 8,000 square feet (for future TI build out) located on the second - [ANTHC Outpatient Surgery Center](https://www.neeserinc.com/anthc-outpatient-surgery-center/) - Make tenant improvements (TI) to the Outpatient Surgery Center. Develop the TI with an integrated project delivery team (IPD) consisting of designers and construction contractors. - [The Mattress Firm](https://www.neeserinc.com/the-mattress-firm/) - Retail space for new mattress store. - [Creekside Tract 6 Core & Shell](https://www.neeserinc.com/creekside-tract-6-core-shell/) - BurgerFi, Body Renew and Krispy Kreme. Core and shell design and general construction per design for a retail plaza. - [Blood Bank of Alaska](https://www.neeserinc.com/blood-bank-of-alaska/) - Approximately 56,500 square foot, 2 story building with the lower level housing the blood processing/laboratory area, the donor area, material receiving, garage and laboratory support. The administration, conference, training, IT and staff areas will be located on a second level. Construction of a new consolidated blood bank facility, consisting of administrative offices, laboratory, donor area - [Grass Creek North Phase I & Phase II](https://www.neeserinc.com/grass-creek-north-phase-i-phase-ii/) - Associated civil work for Phases I on the corner of Creekside Center Drive and Muldoon Road for the construction of eight (8) tri-plex and two (2) four-plex townhome style buildings, one (1) three story twenty-unit multifamily building for a total of fifty-two (52) units. Phase II starts Spring 2016 - [Alaska Native Medical Center, Radiology Server Room Modification](https://www.neeserinc.com/alaska-native-medical-center-radiology-server-room-modification/) - 1500 square foot construction of a new data center for the Radiology Department located in the basement of the Medical Center. Installation of Data Center specific mechanical and electrical infrastructure components. - [Anchorage Jail](https://www.neeserinc.com/anchorage-jail/) - NCI was the low bidder on a 185,000 sq. ft., 400 bed jail project. However, the low bid was five million dollars over the Municipality's budget. NCI negotiated with the Municipality and re-engineered the structure from steel frame to poured-in-place concrete. This re-design, along with other considerations, slashed three million dollars from the original cost. - [Primary Care Center, Phase 1 & 2](https://www.neeserinc.com/primary-care-center-phase-1-2/) - Phase I This 39,000 sq. ft. facility was design-built as a companion facility to the new Alaska Native Medical Center in Anchorage. The facility was a fast-track project with design and construction completed in fourteen months. The structure is concrete and steel housing medical office space. The facility was designed to allow for easy access - [Strawberry Rose Cottages](https://www.neeserinc.com/strawberry-rose-cottages/) - Strawberry Village Cottages were developed, designed, and constructed to meet affordable housing needs for moderate and low income families, utilizing a rent-to-own concept providing a unique pride-of-ownership opportunity. The 60-unit, townhouse-style neighborhood is a family-friendly alternative to condominiums or apartments. This unique project was completed ahead of schedule and under the GMP. - [Dental, Behavioral Health and Optometry Clinic](https://www.neeserinc.com/dental-behavioral-health-and-optometry-clinic/) - NCI was selected for this project because of our strong background in design-build and our long history of successful projects for Southcentral Foundation. As the various departments discussed their needs and space considerations, the project grew from 10,000 to 55,000 sq. ft. NCI worked closely with the owner and architects Kumin Associates, Inc. and Sjoquist - [Southwest Region School District](https://www.neeserinc.com/southwest-region-school-district/) - Togiak K-12 New School - This 70,000 sq. ft. new K-12 school, in the native fishing village of Togiak, Alaska, was a site development of 40 acres on tundra wet land. The school was built on driven piling with precast concrete foundation walls attached to the piling. The building was constructed with structural steel, ISP - [Tyonek Terrace](https://www.neeserinc.com/tyonek-terrace/) - Tyonek Terrace is a 39,860 square foot, 39-unit senior apartment complex located on approximately 2.5 acres at the end of Peck Street off Muldoon Road within Cook Inlet Housing Authority’s existing elder campus. The project consists of 34 one-bedroom (approximately 610 square feet) and 5 two-bedroom (approximately 996 square feet) units. The project is fully - [Alaska Psychiatric Institute](https://www.neeserinc.com/alaska-psychiatric-institute/) - The Alaska Psychiatric Institute (API) Replacement Hospital was the first design-build vertical construction RFP ever issued by the State of Alaska. The design of the new 120,000 sq. ft., 76-bed replacement hospital provides a healing environment without the "institutional feel" of a psychiatric hospital. The main lobby and Winter Garden have slate floors and linear - [Community Education Center](https://www.neeserinc.com/community-education-center/) - The Fort Richardson New Community Education Center (COMC) was one of the first design-build Task Orders issued under NCI's five year MATOC contract with the USACE. The COMC is an attractive multi-story, 50,200 sq. ft. facility housing the post library, lecture halls, education classrooms, a very sophisticated distance learning center linked worldwide (including forward battle - [Bristol Bay Building](https://www.neeserinc.com/bristol-bay-building/) - This fast-track design-build project for Bristol Bay Native Corporation was a 68,410 sq. ft. post tension concrete floor structure. It has a seismic core consisting of a concrete moment frame bearing on continuous single mass slab on grade. The fourth floor level patio has a heated slab for year round use, inclusive of planters with - [Junior NCO Housing](https://www.neeserinc.com/junior-nco-housing/) - The Jr. NCO Housing project was a negotiated design-bid-build task order issued under NCI’s Multi Award Task Order Contract (MATOC) with USACE. The project included all the site work and utilities necessary to develop a stand-alone subdivision on Fort Wainwright. Utilities are delivered to the buildings through over four thousand linear feet of concrete utility - [Wolf Run Village Student Housing](https://www.neeserinc.com/wolf-run-village-student-housing/) - Wolf Run Village is just two blocks from the University of Nevada, Reno (UNR) and only three blocks to the Student Union and Knowledge Center. We are just a short walk away from campus and we provide all our residents with gated, private parking. Our 2,000 sq ft, two-story townhouses feature 5 individually leased rooms, - [Orthopedic Physicians Alaska](https://www.neeserinc.com/orthopedic-physicians-anchorage/) - 63,396 square foot 3-story medical office building and rehabilitation clinic. Maintained the budget through collaborative Owner and NCI design build team efforts. Tenant improvements were constructed within the occupied building. - [Aleutian Pribilof Islands Association Alaska Headquarters](https://www.neeserinc.com/aleutian-pribilof-islands-association/) - The property choice for the new Aleutian Pribilof Island Association Alaska headquarters building was a beautiful wooded private setting near Campbell Creek, but this site created some extreme challenges for the design build-team. The crew met special considerations to create a storm water pollution prevention plan that would work. In addition to standard silt fencing, - [Primary Care Center Phase III & Parking Garage](https://www.neeserinc.com/primary-care-center-phase-iii-parking-garage/) - The Southcentral Foundation’s Primary Care Clinic 3 is located on the Alaska Native Medical Campus in Anchorage, Alaska. PCC 3 is a three-story, 79,000SF facility addition to the two-story, 83,000SF existing facility. The new facility provides connectivity to the main lobby and 2nd floor of the original Primary Care Clinic, and has direct connection to - [Dena'ina Civic and Convention Center](https://www.neeserinc.com/denaina-civic-and-convention-center/) - This 215,000 sq. ft. convention center located in the heart of downtown Anchorage is the foundation of the growing convention industry in Alaska. The need and hope for a facility like this had been around for over two decades, and yet the project never seemed to move beyond the hope stage. An innovative collaboration of - [Fresenius Medical Care](https://www.neeserinc.com/fresenius-medical-care/) - The Anchorage Dialysis location is a 20,000 square foot, 6.1 million, Renal Care Dialysis Center is full to the brim with complex and highly technical mechanical and dialysis systems. It also has architectural complexity that creates a signature appearance for the client through intricate detailing of form and finish. As the CMc/Design-build contractor we managed - [Lower Yukon School District](https://www.neeserinc.com/lower-yukon-school-district/) - The Marshall K-12 School, Hooper Bay K-12 School, and Pilot Station Replacement School each presented unique challenges arising from their remote locations and complex building requirements. But NCI’s capable handling led these complicated projects to their successful completion. Marshall K-12 School - Construction project consists of a new K-12 school of approximately 42,257 square feet - [Norton Sound Regional Hospital](https://www.neeserinc.com/norton-sound-regional-hospital/) - This 154,000 square foot, 14 bed hospital is located on an 8 acre site in Nome, Alaska. Nome is located on the south coast of the Seward Peninsula in the Norton Sound region roughly 140 miles south of the Arctic Circle. The structure is a steel frame on a pile foundation. The exterior envelope is - [Millennium Alaskan Hotel Anchorage - Various Projects](https://www.neeserinc.com/millennium-alaskan-hotel-anchorage-various-projects/) - Rooms and Corridors This project consists of construction services in connection with the renovation of all the Guestrooms, renovation of the Guestroom Corridors (4), the ADA Room upgrades and the conversion of two existing Jacuzzi rooms to standard Guestrooms. Third Floor Conferencing Center and Ball Room Renovations: This project included the complete retrofit of all - [Yukon Flats School District](https://www.neeserinc.com/yukon-flats-school-district/) - Venetie School Addition/Remodel - This project consisted of a 16,000 sq. ft. addition to the existing BIA School in Venetie, Alaska. It also included extensive remodeling to the existing school, as well as site improvements. The structure is basically wood construction on a refrigerated pile foundation. Chalkyitsik School - This project consisted of 10,878 sq. - [Benny Benson School](https://www.neeserinc.com/benny-benson-school/) - NCI accomplished substantial completion of the Benny Benson School on March 17, 1991. The school is a 30,000 sq. ft. slab on a grade wood frame building, with "hi-tech" sophisticated mechanical and electrical systems. The facility, which is located within a park-like setting in East Anchorage, will provide an alternative education source for junior and - [Veterans Administration Outpatient Clinic-Regional Offices](https://www.neeserinc.com/veterans-administration-outpatient-clinic-regional-offices/) - This project, consisting of approximately 204,000 sq. ft., was a design-build lease-back competition. NCI was awarded the contract in September of 1990. Construction began in April 1991, with completion in December 1991, and utilized fast-track construction methods. The project consisted of a six-story poured-in-place concrete (post tension) structure founded on steel pilings. The lower three - [Anchorage City Hall, Hill Building](https://www.neeserinc.com/anchorage-city-hall-hill-building/) - This project consisted of the complete gutting and renovation of Anchorage City Hall. The 144,000 sq. ft. building was retrofitted with a concrete ductile moment frame in order to meet all the seismic requirements of the 1991 Uniform Building Code. At the same time, NCI upgraded the entire building from top to bottom, implementing - [Anchorage Water & Wastewater Headquarters](https://www.neeserinc.com/anchorage-water-wastewater-headquarters/) - The complete renovation of the Anchorage Water and Wastewater Utility headquarters building, located at 3000 Arctic Blvd, totaled 41,500 sq. ft. The project included a 6,200 sq. ft. addition to the existing building. The scope of the work required asbestos abatement, structural upgrades, parking lots, landscaping, elevator partitions, door finishes, and new mechanical and electrical. - [Office of Health & Human Services](https://www.neeserinc.com/office-of-health-human-services/) - This was a new office complex required by GSA for Health and Human Services in Anchorage, Alaska. It consists of a 21,566 sq. ft. wood frame building erected on a 12 inch floating mass slab. All phases of construction were provided as a part of a fast-track design-build project. The time frame from the start - [Ernie Turner Alcoholism Recovery Center](https://www.neeserinc.com/ernie-turner-alcoholism-recovery-center/) - NCI completed this design-build project in six months, from design through the final stages of construction. The building is a 13,600 sq. ft., two-story structure on masonry walls, functioning as a 32-bed (including two handicap accessible rooms) alcohol recovery center. Most of the rooms are double bed capacity. The center has living quarters, meeting rooms, - [Alaska Regional Hospital Campus](https://www.neeserinc.com/alaska-regional-hospital-campus/) - Alaska Regional Medical Office Building West - This design-build, three-story medical office building consists of approximately 50,000 sq. ft. and is located on campus. Tenant improvements were built out as the doctors leased the space. Alaska Regional Medical Office Building "C" - This design-build, four-story medical office building consists of approximately 88,000 sq. ft. and - [AAFES Joint Military Mall](https://www.neeserinc.com/aafes-joint-military-mall/) - This was a fast-track design-build project using concrete tilt-up and steel. It consists of 330,000 sq. ft. of building, 7.6 acres of floor, 7.6 acres of roof, and one million sq. ft. of paving—all designed and constructed in under seventeen months. This facility provides a large, full-service commissary (super market), a main exchange retail store - [Walmart Supercenter](https://www.neeserinc.com/walmart-supercenter/) - Wal-Mart had been trying to build on their site in Eagle River for three years, but had encountered a substantial opposition from the surrounding community. After winning the design-build competition, NCI stepped in as liaison between Wal-Mart and the Community Council to get the project accepted. The result was a 103,000 sq. ft. concrete and - [Anchorage Downtown Fire Station](https://www.neeserinc.com/anchorage-downtown-fire-station/) - This is a design-build, 30,000 sq. ft. masonry and steel building housing a new Municipal Fire Station with a hose drying tower and separate administration building. An interesting aspect of this project is that the developer bought land within a specified area, leased the land to the Municipality during the construction period, and then demolished - [UAA Parking Garage](https://www.neeserinc.com/uaa-parking-garage/) - The UAA Parking Garage was a hard bid competition. Due to design problems, the project was two months behind schedule; to bring it back on track the owner requested we accelerate construction instead of extending the completion time. This acceleration was accomplished before the winter weather set in and the project was completed as - [South Anchorage High School](https://www.neeserinc.com/south-anchorage-high-school/) - South Anchorage High School is a 240,000 sq. ft. facility designed to serve approximately 1,600 students. It is located on 50 acres of naturally wooded slope and was constructed of concrete foundation and structural steel. The exterior facade is finished with a curtain wall, metal panel/siding, and a CMU veneer. The design of the school - [Grass Creek Village](https://www.neeserinc.com/grass-creek-village/) - Grass Creek Village has 80 townhome style mixed-income units. There are 8 different building designs within the 22 buildings each being either tri-plex, or four-plex configurations. One, two, three, and four bedroom units are available. Each unit has an attached garage. All residents have access to the centralized community club house. The site is laid - [Target Store #T-2239](https://www.neeserinc.com/target-store-t-2239/) - NCI completed the 166,400 square foot, $19.8 million, Target Store in Wasilla Alaska in late 2008. The new store is located on the site that was formerly Cottonwood Creek Mall. The contract included the demolition and removal of the existing facilities, extensive site work which included pad development for several satellite businesses, and tilt-up concrete - [Target Store #T-2372](https://www.neeserinc.com/target-store-t-2372/) - The South Anchorage Target Store was completed by NCI in late 2009 and is similar in size to the Wasilla location (166,400SF). The construction type is concrete tilt-up attached to a structural steel frame system. Significant wetlands issues were addressed during design and early stages of site development. NCI worked cooperatively with DEC and EPA - [Camp Kushtaka, Dining Hall Phase I](https://www.neeserinc.com/camp-kushtaka-dining-hall-phase-i/) - Stage 1 is a new Dining and Community Hall, and Commercial Kitchen to provide food service for Camp Fire USA’s stay-away campers on Kenai Lake. Stage II is a new Shower House and Health Services Facility to serve the same campers. These facilities add to the new Bunk Houses NCI constructed in 2010, and complete - [UAA MSC Paramedic Nursing Addition](https://www.neeserinc.com/uaa-msc-paramedic-nursing-addition/) - The work consists of an addition to the Snodgrass Hall, an existing classroom building on the Matanuska-Susitna College Campus in Palmer, AK. The addition houses the nursing and paramedic programs. The work primarily consisted of two specialized classrooms, two offices, storage, work spaces, an ambulance simulation bay, addition of a canopy and changes to the - [St. Patricks Church, Court Yard](https://www.neeserinc.com/st-patricks-church-court-yard/) - Neeser Construction Connected the 3 existing buildings The Parish, the Hall and the Administration Building with a walk way that consisted of Structural Steel and CMU to create a courtyard. Inside the Courtyard, we built seven different sections of Columbaria’s (Eternal Resting places) with prayer kneelers in front of the Columbaria and four fountains with - [Valley Native Primary Care Center](https://www.neeserinc.com/valley-native-primary-care-center/) - The Valley Native Primary Care Center in Wasilla, Alaska is an 85,000 square foot, two-story primary care center. The project was funded through a USDA loan. The facility will provide the Mat-Su valley with native health program services negating the need to commute into Anchorage. The programs within the facility include primary care, behavioral health, - [Pioneer GI Clinic](https://www.neeserinc.com/pioneer-gi-clinic/) - Remodel of suite 210 at Alaska Regional Medical Plaza Building - [KAKM - Set Remodel](https://www.neeserinc.com/kakm-set-remodel/) - Set Remodel for Alaska Public Television - KAKM http://www.alaskapublic.org/kakm/ - [Trailside Heights](https://www.neeserinc.com/trailside-heights/) - Trailside Heights Apartments has 66 townhome style moderate income housing units, and a Community Center. This project features 22 Triplexes with five different building designs and seven different 2 and 3 bedroom floor plans, to include 4 fully ADA accessible units. All homes have heated garages, modern appliances and features, and large view windows to - [Natural Pantry](https://www.neeserinc.com/natural-pantry/) - The Natural Pantry is a 45,000 SF single story retail establishment with parking for 175 vehicles and a new bus stop and bus shelter located near corner of 36th and A Street. Direct sidewalk access between the bus stop and the store is provided for costumer convenience. Other outside amenities include heated sidewalks, sidewalk canopies - [ANMC Hybrid Operation Room](https://www.neeserinc.com/anmc-hybrid-operation-room/) - The Hybrid Operating Room Suite was constructed to address the need for performing interventional radiology and angiography procedures. The work consisted of the construction of the Hybrid OR suite, associated equipment and storage rooms, modifications to the existing women's locker room, and hallway modifications within the Alaska Native Medical Center - [Coronado Park Senior Housing](https://www.neeserinc.com/coronado-park-senior-housing/) - New 4 story, 76,804 square foot 56 unit senior living facility with underground parking. Site footprint at garage level is approximately 18,900 square feet. Level one housing is approximately 16,280 square feet. Levels two and three are approximately 18,450 square feet and level four approximately 10,230 square feet. Building is structural steel frame. Exterior walls - [UAA - School of Engineering and Industry Building](https://www.neeserinc.com/uaa-school-of-engineering-and-industry-building/) - The project consists of a new four story, 75,000 + gross square foot laboratory / classroom building and the renovation of an existing three story, 40,000 gross square foot engineering building with additional design services for a parking structure. The first floor includes the lobby, teaching labs and building support spaces including storage, mechanical and - [Northern Lights Media Center - KTUU Channel 2](https://www.neeserinc.com/northern-lights-media-center-ktuu-channel-2/) - The Northern Lights Media Center is a 40,000SF design-build project that contains TV and sound production studios, a news room, 7 satellite antennae both roof and on grade mounted, a 110’ tower with microwave and telephone antennae. The facility must stay operational during catastrophic events and is constructed to meet the parameters of an essential - [Central Peninsula Hospital Phase 2A Radiology Department Expansion](https://www.neeserinc.com/central-peninsula-hospital-phase-2a-radiology-department-expansion/) - This project consists of 5,900 square feet of new/renovated single story construction of a steel framed building addition to house medical imaging services for the radiology department at the Hospital. Site work includes concrete curb, sidewalk asphalt paving and landscaping. - [Central Peninsula Hospital Phase V Specialty Clinics Building](https://www.neeserinc.com/central-peninsula-hospital-phase-v-specialty-clinics-building/) - This project consists of approximately 89,000 square feet of new single story construction of a steel framed building to house specialty clinic services for Central Peninsula Hospital. - [Eagle River Elementary School Site Improvement](https://www.neeserinc.com/eagle-river-elementary-school-site-improvement/) - This project consists of civil site work rleated to the demolition of paving, sidwalk, curb and gutter, storm drainage system and site lighting. The work shall include removing & replacing a portion of subgrade, as outlined in the contract documents, moving and replacing out buildings, so as to accomplish the work, removing and replacing a - [326 L St. Parking Lot](https://www.neeserinc.com/326-l-st-parking-lot/) - Soil remediation, building demolition, and paving of new parking lot for downtown Anchorage - [Ridgeline Terrace](https://www.neeserinc.com/ridgeline-terrace/) - associated civil work for the construction of fourteen (14) townhome style buildings for a total of seventy (70) units and one (1) 5,200 square foot community building located on Mountain View Drive in Anchorage, Alaska. ## Pages - [Home](https://www.neeserinc.com/) - [About](https://www.neeserinc.com/about/) - Quality - Integrity - Budget Neeser Construction, Inc is a leading General Contracting firm with an extensive portfolio of successful projects. We target, acquire, develop, and build by blending real estate development and design-build construction expertise into one unique package. We have experience in the private sector, federal, state, and local governments, and public/private partnerships. With over - [Fraud](https://www.neeserinc.com/fraud/) - Fraud issues that have arisen - [Careers](https://www.neeserinc.com/careers/) - Neeser Construction, Inc. is an equal opportunity employer. Job openings Alaska, Washington and Nevada… - [Contact](https://www.neeserinc.com/contact/) - When you are looking to build an office building, medical facility, school in the bush, or your own unique structure, Neeser Construction has the resources to make your project a success and the ability to build your dream into a reality. Whether you choose to go with the design/build concept, the more conventional hard bid - [History](https://www.neeserinc.com/history/) - Neeser Construction, Inc. started from humble beginnings in Eastern Washington and Western Idaho to its current roster of hand-picked, highly skilled employees in Alaska and the Great Northwest. Neeser Construction, Inc. (NCI) is comprised of folks who have the passion to learn and excel. These qualities were instilled in Jerry Neeser and his brothers, by - [Testimonials](https://www.neeserinc.com/testimonials/) - Neeser Construction, Inc is a leading General Contracting firm with an extensive portfolio of successful projects. Our Testimonials say it all. - [News](https://www.neeserinc.com/news/) - Neeser Construction Inc. is regularly featured in local news outlets for the projects they are a part of. - [Ethics](https://www.neeserinc.com/ethics/) - Neeser Construction, Inc. requires it's employees, subcontractors and suppliers to operate according to the company's Code of Business Ethics and Conduct. Any violations noted may be reported per the following: Mail: Neeser Construction, Inc. 2501 Blueberry Road Anchorage, AK 99503 Phone: (907) 276-1058 or Anonymously at (877) 378-7126 ## News - [Downtown Glacier](https://www.neeserinc.com/news/downtown-glacier/) - [Alaska Activity Report](https://www.neeserinc.com/news/alaska-activity-report/) - [New apartments open in Carson City](https://www.neeserinc.com/news/new-apartments-open-in-carson-city/) - [Chugach Foothills Connector opens](https://www.neeserinc.com/news/chugach-foothills-connector-opens/) - [Kingsbarn Capital & Development Breaks Ground on Multifamily Project in Carson City, The Marlette](https://www.neeserinc.com/news/kingsbarn-capital-development-breaks-ground-on-multifamily-project-in-carson-city-the-marlette/) - [Las Vegas-based real estate development to break ground on Carson City apartment complex in February](https://www.neeserinc.com/news/las-vegas-based-real-estate-development-to-break-ground-on-carson-city-apartment-complex-in-february/) - [4th Avenue construction an early step in effort to improve downtown Anchorage infrastructure](https://www.neeserinc.com/news/4th-avenue-construction-an-early-step-in-effort-to-improve-downtown-anchorage-infrastructure/) - [Alaskan-Born Neeser Construction Expands in Reno-Tahoe](https://www.neeserinc.com/news/alaskan-born-neeser-construction-expands-in-reno-tahoe/) - [Exclusive Tour of the Emory at Reno Experience District](https://www.neeserinc.com/news/exclusive-tour-of-the-emory-at-reno-experience-district/) - [Army engineers plan to build alternate care facility in Anchorage](https://www.neeserinc.com/news/army-engineers-plan-to-build-alternate-care-facility-in-anchorage/) - [Building Mat-Su: Wasilla Creek Commons](https://www.neeserinc.com/news/building-mat-su-wasilla-creek-commons/) - Building Mat-Su: Wasilla creek commons WHAT: A two-phase development made up of about 150 lots on 110 acres along Trunk Road. The first phase is 77 lots, unbuilt, with roads, water and on-site septic, developer Jerry Neeser said. The subdivision has a water theme due to its creek-front location, Neeser said: Entry is on Tributary - [Parker, Smith & Feek Excellence in Construction Awards](https://www.neeserinc.com/news/parker-smith-feek-excellence-in-construction-awards/) - [Missile Defense Agency: ‘Kill vehicle’ contract cancellation won’t affect Greely expansion](https://www.neeserinc.com/news/missile-defense-agency-kill-vehicle-contract-cancellation-wont-affect-greely-expansion/) - [Anchorage developer has big vision, big budget for Wasilla jewel](https://www.neeserinc.com/news/anchorage-developer-has-big-vision-big-budget-for-wasilla-jewel/) - [Building boom remakes Eagle River](https://www.neeserinc.com/news/building-boom-remakes-eagle-river/) - [Alaska Native Medical Center to host state’s first Ronald McDonald House](https://www.neeserinc.com/news/alaska-native-medical-center-to-host-states-first-ronald-mcdonald-house/) - [IIDA Announces Winners of 2017 Healthcare Interior Design Competition - ANTHC- Patient Housing](https://www.neeserinc.com/news/iida-announces-winners-of-2017-healthcare-interior-design-competition-anthc-patient-housing/) - [Hostetler Park renovation project wraps up, honors victims of violent crimes](https://www.neeserinc.com/news/hostetler-park-renovation-project-wraps-up-honors-victims-of-violent-crimes/) - [Norton Sound Hospital Voted 6th Most Beautiful in U.S.](https://www.neeserinc.com/news/norton-sound-hospital-voted-6th-most-beautiful-in-u-s/) - [Iowa City artist nearly finished with sculpture for Alaska wellness center](https://www.neeserinc.com/news/iowa-city-artist-nearly-finished-with-sculpture-for-alaska-wellness-center/) - [Raven Plaza, traditional healing dedicated at Dena’ina Wellness Center](https://www.neeserinc.com/news/raven-plaza-traditional-healing-dedicated-at-denaina-wellness-center/) - [Kenaitze Indian Tribe celebrates opening of Dena’ina Wellness Center](https://www.neeserinc.com/news/kenaitze-indian-tribe-celebrates-opening-of-denaina-wellness-center/) - [New Valley Native Primary Care Clinic Unveiled In Wasilla](https://www.neeserinc.com/news/new-valley-native-primary-care-clinic-unveiled-in-wasilla/) - [Children's dental clinic inching closer to completion](https://www.neeserinc.com/news/childrens-dental-clinic-inching-closer-to-completion/) - [Hitting all pediatric dental needs for Alaska Native youth](https://www.neeserinc.com/news/hitting-all-pediatric-dental-needs-for-alaska-native-youth/) - [Fisher House Foundation breaks ground on second JBER facility](https://www.neeserinc.com/news/fisher-house-foundation-breaks-ground-on-second-jber-facility/) - [JBER Fisher House expanding to meet the needs of military patients and families](https://www.neeserinc.com/news/jber-fisher-house-expanding-to-meet-the-needs-of-military-patients-and-families/) - [Fisher House opens doors to more military families](https://www.neeserinc.com/news/fisher-house-opens-doors-to-more-military-families/) - [Shaw Road Elementary’s new look: Laptops, smart boards and mobile desks](https://www.neeserinc.com/news/shaw-road-elementarys-new-look-laptops-smart-boards-and-mobile-desks/) - [Combining local Nevada muscle with backup from Alaska](https://www.neeserinc.com/news/combining-local-nevada-muscle-with-backup-from-alaska/) - [Wolf Run East: New, affordable student housing off campus](https://www.neeserinc.com/news/wolf-run-east-new-affordable-student-housing-off-campus/) - [Big dreams: Anchorage developer has vision for Mat-Su Resort](https://www.neeserinc.com/news/big-dreams-anchorage-developer-has-vision-for-mat-su-resort/) - [New student housing development east of UNR to open summer 2017](https://www.neeserinc.com/news/new-student-housing-development-east-of-unr-to-open-summer-2017/) - [Survey: Subs keep getting harder to find in hot market](https://www.neeserinc.com/news/survey-subs-keep-getting-harder-to-find-in-hot-market/) - [Wolf Run Village Unveils New Sister Property, Wolf Run East](https://www.neeserinc.com/news/2096/) - [New patient housing facility to open doors next week](https://www.neeserinc.com/news/new-patient-housing-facility-to-open-doors-next-week/) - [South Reno senior affordable housing project breaks ground](https://www.neeserinc.com/news/south-reno-senior-affordable-housing-project-breaks-ground/) - [New senior living facility breaks ground in South Reno](https://www.neeserinc.com/news/new-senior-living-facility-breaks-ground-in-south-reno/) - [Shaw Road Elementary addition aims to reduce class sizes](https://www.neeserinc.com/news/shaw-road-elementary-addition-aims-to-reduce-class-sizes/) - [Neeser Construction & AKDOT – Diverging Diamond Interchange](https://www.neeserinc.com/news/neeser-construction-akdot-diverging-diamond-interchange/) - [Alaska Native Medical Center Patient Housing Facility](https://www.neeserinc.com/news/alaska-native-medical-center-patient-housing-facility/) - [Muldoon interchange moves closer to getting new look, ease traffic congestion](https://www.neeserinc.com/news/muldoon-interchange-moves-closer-to-getting-new-look-ease-traffic-congestion/) - [Nome Celebrates Opening of New State-of-the-Art Hospital, Hundreds Turn Out for Grand Opening](https://www.neeserinc.com/news/nome-celebrates-opening-of-new-state-of-the-art-hospital-hundreds-turn-out-for-grand-opening/) - [Southcentral Foundation Valley Native Primary Care Center Scheduled to Open](https://www.neeserinc.com/news/southcentral-foundation-valley-native-primary-care-center-scheduled-to-open/) - [DBIA Recognizes Three Correctional Facilities for 2012](https://www.neeserinc.com/news/dbia-recognizes-three-correctional-facilities-for-2012/) - [Unique-to-Alaska church cloister on the list for the annual city garden tour](https://www.neeserinc.com/news/unique-to-alaska-church-cloister-on-the-list-for-the-annual-city-garden-tour/) - [A Testament to Design-Build](https://www.neeserinc.com/news/a-testament-to-design-build/) - [Krispy Kreme, BurgerFi and a gym](https://www.neeserinc.com/news/1909/) - [Neeser Construction featured in Alaska Under Construction's September 2000 issue](https://www.neeserinc.com/news/neeser-construction-featured-in-alaska-under-constructions-september-2000-issue/) - An interview with Jerry Neeser of Neeser Construction Jerry Neeser’s competitors have courted his workers on occasion. But his employees aren’t about to defect. Neeser Construction Inc., which employs between 50 and 200 workers, has been around too long while so many others have gone bust over the years. "No one can promise them the - [JBER Mall featured in Northwest Construction magazine as the #2 Alaska construction project in their top 10 listing.](https://www.neeserinc.com/news/jber-mall-featured-in-northwest-construction-magazine-as-the-2-alaska-construction-project-in-their-top-10-listing/) - The Elmendorf/Fort Richardson Community Center Mall is a design/build, fast-track project at the Elemendorf Air Force Base. The 300,000 sq.-ft. community shopping center brings several services from Fort Richardson and Elmendorf AFB under one roof to serve both the Army and the Air Force. Services will include AAFES Exchange, DeCA Commissary, Military Clothing Supply Services, - [Neeser Construction featured in Alaska Business Monthly](https://www.neeserinc.com/news/neeser-construction-featured-in-alaska-business-monthly/) - With 1997 gross annual revenues of $16.8 million, Neeser Construction, Inc. of Anchorage is a newcomer to the 49ers list this year, but certainly isn't a newcomer to Alaskan business. The company, which specializes in design-build construction, does work statewide, averaging three to five major projects and several dozen smaller projects annually. Currently crews are - [2015 Excellence in Construction Awards](https://www.neeserinc.com/news/2015-excellence-in-construction-awards/) - Your browser does not support the video tag. - [AGC-Alaska Award Winners](https://www.neeserinc.com/news/agc-alaska-award-winners/) - [Health Campus Pedestrian Bridge](https://www.neeserinc.com/news/health-campus-pedestrian-bridge/) - [UAA Bridge Project](https://www.neeserinc.com/news/uaa-bridge-project/) - [Providence Drive Closing For Bridge](https://www.neeserinc.com/news/providence-drive-closing-for-bridge/) - [Channel 2 Open House](https://www.neeserinc.com/news/30/) - [Ground Broken at VA for Local Fisher House](https://www.neeserinc.com/news/ground-broken-at-va-for-local-fisher-house/) - [UAA: Construction for Parking Garage](https://www.neeserinc.com/news/uaa-construction-for-parking-garage/) - [Dena'ina Wellness Center Grand Opening](https://www.neeserinc.com/news/denaina-wellness-center-grand-opening/) - [Coronado Park Senior Village](https://www.neeserinc.com/news/coronado-park-senior-village/) - [UAA Engineering and Industry Building](https://www.neeserinc.com/news/uaa-engineering-and-industry-building/) - [Top 49ers named](https://www.neeserinc.com/news/top-49ers-named/) - [The Anchorage Chamber of Commerce 2013 Gold Pan Awards](https://www.neeserinc.com/news/the-anchorage-chamber-of-commerce-2013-gold-pan-awards/) - [KTUU Announces New Facility](https://www.neeserinc.com/news/ktuu-announces-new-facility/) - [Buildings Remake Eagle River](https://www.neeserinc.com/news/buildings-remake-eagle-river/) - [Natural Pantry Moving to Stand-Alone Store](https://www.neeserinc.com/news/natural-pantry-moving-to-stand-alone-store/) - [Best of the Northwest](https://www.neeserinc.com/news/best-of-the-northwest/) - ["Top 49ers" Neeser Construction, Inc. comes in at #23](https://www.neeserinc.com/news/top-49ers-neeser-construction-inc-comes-in-at-23/) - Alaska Business Monthly #23 - Neeser Construction, Inc. Worldwide Employees: 277 Alaska Employees: 274 Year Established: 1974 Rank Previous Year: 20 REVENUE : (Millions $) 2011................................160.00 2010................................182.00 2009................................110.40 2008................................105.20 2007................................130.00 Change -13% from 2010 TOP EXECUTIVE: Gerlad Neeser, Pres. MAIN BUSINESS: General Contracting PRINCIPAL ACTIVITIES: General contracting, commercial, industrial, medical, multifamily, retail and correctional. Design-build - [New State Crime Lab](https://www.neeserinc.com/news/new-state-crime-lab/) - [Public Art Sculpture At New Crime Lab](https://www.neeserinc.com/news/public-art-sculpture-at-new-crime-lab/) - [Goose Creek Correctional Center](https://www.neeserinc.com/news/goose-creek-correctional-center/) - [Senators Find Money for Wasilla Native Clinic](https://www.neeserinc.com/news/senators-find-money-for-wasilla-native-clinic/) - [DDC Journal A Great Team Helps Sustain a Sound Reputation](https://www.neeserinc.com/news/ddc-journal-a-great-team-helps-sustain-a-sound-reputation/) - [The Alaska Contractor Camp Fire Gets A Boost From AGC Members](https://www.neeserinc.com/news/the-alaska-contractor-camp-fire-gets-a-boost-from-agc-members/) - "Camp Fire gets a boost from AGC members" By Jody Ellis-Knapp Anchorage architectural and interiors firm ECI/Hyer recently designed a new dining hall for Camp Fire USA’s Camp K on Kenai Lake. Neeser Construction is building the new hall, which is a rebuild of the original structure. “This new facility will provide us with the - [Philanthropy in Alaska, Businesses give back to the community.](https://www.neeserinc.com/news/philanthropy-in-alaska-businesses-give-back-to-the-community/) - [Goose Creek Correctional Center](https://www.neeserinc.com/news/goose-creek-correctional-center-2/) - [The Alaska Contractor New facility to help analysts tackle State](https://www.neeserinc.com/news/the-alaska-contractor-new-facility-to-help-analysts-tackle-state/) - Scientific Crime Detection Laboratory New facility to help analysts tackle State's backlog of evidence By Rindi White How many construction projects in Alaska require installation of dense impact-resistant steel and Kevlar reinforced rubber to prevent a stray bullet from escaping? Or fume hoods strong enough to allow law enforcement officers to safely make methamphetamine - ["Top 49ers" Neeser Construction, Inc. comes in at #20](https://www.neeserinc.com/news/top-49ers-neeser-construction-inc-comes-in-at-20/) - #20 - Neeser Construction, Inc. Worldwide Employees: 325 Alaska Employees: 320 Year Established: 1975 Rank Previous Year: 33 REVENUE : (Millions $) 2010................................182.00 2009................................110.40 2008................................105.20 2007................................130.00 2006................................148.00 Change -65% from 2009. TOP EXECUTIVE: Gerlad Neeser, Pres. MAIN BUSINESS: General Contracting PRINCIPAL ACTIVITIES: General contracting, commercial, industrial, medical, multifamily, retail and correctional. Design-build fast-track turnkey projects. - [Neeser Specializes in High Profile Projects](https://www.neeserinc.com/news/neeser-specializes-in-high-profile-projects/) - Neeser Construction, Inc. Anchorage-based design-build company specializes in high-profile projects By Carly Horton Stuart The Dena’ina Civic and Convention Center, the Alutiiq Center, South Anchorage High School and the 188 W. Northern Lights Building — much of Anchorage’s modern cityscape was built by Neeser Construction Inc. Covering a broad range of commercial work, including - [Goose Creek Correctional Center Benefits Inmates](https://www.neeserinc.com/news/goose-creek-correctional-center-benefits-inmates/) - Goose Creek Correctional Center One of Alaska’s largest construction projects benefits inmates, Valley workforce By Rindi White Goose Creek Correctional Center, the state’s largest prison and one of the largest construction projects in Alaska history, is less than a year away from housing inmates. The prison recently came under fi re during state budget - [Indian Health Service Joint Venture Construction Program](https://www.neeserinc.com/news/indian-health-service-joint-venture-construction-program/) - Indian Health Service Joint Venture Construction Program awards help Alaska Native nonprofits to expand health care services Fast track schedules keep contractors hustling By Rachael Fisher Health care construction is on the rise this summer with contractors hard at work on new significant projects for Alaska Native nonprofits such as Southcentral Foundation’s Valley Native Primary - [Southcentral Foundation Breaks Ground on Valley Native Primary Care Center](https://www.neeserinc.com/news/southcentral-foundation-breaks-ground-on-valley-native-primary-care-center/) - [Neeser Construction and The First Tee of Alaska](https://www.neeserinc.com/news/neeser-construction-and-the-first-tee-of-alaska/) - ['Movers and Shakers' featuring George Tuckness of Neeser Construction](https://www.neeserinc.com/news/movers-and-shakers-featuring-george-tuckness-of-neeser-construction/) - [Point Macprison ahead of schedule.](https://www.neeserinc.com/news/point-macprison-ahead-of-schedule/) - [Neeser Construction Inc. – Goose Creek Correctional Center](https://www.neeserinc.com/news/neeser-construction-inc-goose-creek-correctional-center/) - [Norton Sound Regional Hospital project](https://www.neeserinc.com/news/norton-sound-regional-hospital-project/) - [Nome Hospital](https://www.neeserinc.com/news/nome-hospital/) - ['Top 49ers' Neeser Construction, Inc. comes in at #32](https://www.neeserinc.com/news/top-49ers-neeser-construction-inc-comes-in-at-32/) - #19 - Neeser Construction, Inc. Worldwide Employees: 345 Alaska Employees: 339 Year Established: 1975 Rank Previous Year: 22 REVENUE : (Millions $) 2008................................110.00 2007................................130.00 2006................................148.10 2005................................126.70 2004..................................91.30 Change -15.38% from 2007. TOP EXECUTIVE: Gerlad Neeser, Pres. MAIN BUSINESS: Construction PRINCIPAL ACTIVITIES: General contracting, commercial, industrial, medical, multifamily, retail and correctional. Design-build fast-track turnkey projects. Hard - [Target Plans Oct. 11 opening for 3rd store](https://www.neeserinc.com/news/target-plans-oct-11-opening-for-3rd-store/) - ["Top 49ers" Neeser Construction, Inc. comes in at #19](https://www.neeserinc.com/news/top-49ers-neeser-construction-inc-comes-in-at-19/) - 2007 Alaska's Top 49ers: Economic Piplines to the Future Every October Alaska Business Monthly salutes the top 49 Alaskan-Owned and operated businesses in the state, based on gross revenues for the previous year. Here we have listed 2006 revenues in millions of dollars. TOP EXECUTIVE: Gerlad Neeser, Pres. MAIN BUSINESS: Construction PRINCIPAL ACTIVITIES: General contracting, - [Going up & New Dena'ina Civic Center numbers](https://www.neeserinc.com/news/going-up-new-denaina-civic-center-numbers/) - Going Up When completed next year, the 215,000-square-foot Dena'ina Civic and Convention Center will provide more than four times the floor space of the existing Egan Covnention Center - and change the Anchorage skiyline. Daily News photographer Marc Lester documents a building on the rise. New Dena'ina Civic Center numbers With a price tag that - [Before you gripe about this cold, imagine working in it](https://www.neeserinc.com/news/before-you-gripe-about-this-cold-imagine-working-in-it/) - Before you gripe about this cold, imagine working in it Anchorage civic-center builders find ways to handle chill By ALEX deMARBAN As smokers shivered outside buildings and pedestrians hustled to cars Wednesday morning in near-zero temperatures, steel workers building Anchorage's new convention center straddled metal beams 100 windy feet off the ground. If anyone's got - [Aleuts create a home away from home](https://www.neeserinc.com/news/aleuts-create-a-home-away-from-home/) - Aleuts create a home away from home What: The design and construction cost for the three-story, 40,770-square-foot Aleutian Pribilof Islands Association building along Campbell Creek is $12.2 million, the association said. The structure will be a steel-braced frame. Exterior finish will be granite tile and insulated vision glass units. There will be a decorative two-story - [Construction, safety earn association honors](https://www.neeserinc.com/news/construction-safety-earn-association-honors/) - Construction, safety earn association honors The Associated General Contractors recognized its top construction jobs and safety programs in the state at its annual conference that ended Saturday in Anchorage. Bert Bell of GHEMM Co. in Fairbanks won the building industry trade group's Hard Hat Award. Bell was AGC president in 2001. The award goes to - [Airport car rental gets its own garage](https://www.neeserinc.com/news/airport-car-rental-gets-its-own-garage/) - Airport car rental gets its own garage What: The Anchorage Rental Car Center at Ted Stevens Anchorage International Airport. The four-story, 618,000-square-foot building is to house the cars and operations of all the rental companies operating at the airport and provide some public parking. The center includes 12 car washes and 16 fueling and cleaning - [Neeser Construction listed at #18 on Alaska Business Monthly "2006 Top 49ers"](https://www.neeserinc.com/news/neeser-construction-listed-at-18-on-alaska-business-monthly-2006-top-49ers/) - Every October Alaska Business Monthly salutes the top 49 Alaskan-Owned and operated businesses in the state, based on gross revenues for the previous year. Here we have listed 2005 - 2006 revenues in millions of dollars. TOP EXECUTIVE: Gerald Neeser, Pres. MAIN BUSINESS: Construction PRINCIPAL ACTIVITIES: General contracting, commercial, industrial, medical, multifamily, retail and correctional. - [Aleut-Pribilof group to get new digs](https://www.neeserinc.com/news/aleut-pribilof-group-to-get-new-digs/) - Aleut-Pribilof group to get new digs The Aleutian Pribilof Islands Association is constructing a new headquarters building on East International Airport Road between the Seward Highway and the Old Seward Highway. The design and construction costs for the three-story, 40,770-square-foot building along Campbell Creek is $12.2 million, the agency said. Koonce Pfeffer Bettis designed it, - [Gateway Garage Latest for AIA](https://www.neeserinc.com/news/gateway-garage-latest-for-aia/) - Pacific Builder & Engineer June 16, 2006 Issue Gateway Garage Story and Photos by Gene Storm Anchorage Rental Car Center Continues Airport Growth The Ted Stevens Anchorage International Airport is a global, national and regional transportation hub that has experienced substantial growth over the past few years. That growth has fueled a continuous stream of - [Alaska Contractor Nets Big Returns](https://www.neeserinc.com/news/1037/) - Last summer, Neeser Construction Inc. received the largest retro-return check Liberty Northwest has issued to a workers' compensation policyholder in Alaska. Contributing to the '03-'04 policy-year return is the Anchorage-based company's solid safety performance. Key there is its direct job-site management. To each project Neeser assigns a project supervisor, who designates a safety representative on - [Fairbanks Sees Near Record Construction Season](https://www.neeserinc.com/news/fairbanks-sees-near-record-construction-season/) - MILITARY PROJECTS PROSPEROUS The increase in military spending in the Interior can be attributed to development of a Stryker brigade in the U.S. Army Alaska, with most of those quick-response soldiers based at Fort Wainwright in Fairbanks. A number of Army housing projects, linked with that change in troop designation and its resulting increase in - [Alaska Construction Industry Still Holds Strong.](https://www.neeserinc.com/news/alaska-construction-industry-still-holds-strong/) - About $6 billion was spent on construction in 2005, and that figure is expected to rise by 5 percent to 8 percent in 2006. As the summer of 2005 came to a close, Neeser Construction wrapped up the new Alaska Psychiatric Institute building, the Fort Richardson Community Learning Center, and the Bristol Bay Native Corp. - [Neeser Construction Inc. listed as #15 of the top 49 Alaska Businesses.](https://www.neeserinc.com/news/neeser-construction-inc-listed-as-15-of-the-top-49-alaska-businesses/) - This spring, Neeser Construction Inc. will begin work on Anchor-age’s new 193,000-square-foot civic and convention center downtown. The estimated $93 million center is one of several projects the Alaska general contractor has planned. “We have two years’ worth of work on the books,” said company President Jerry Neeser. The achievement is rare since most construction - [Alutiiq design is a tribute to optimism](https://www.neeserinc.com/news/alutiiq-design-is-a-tribute-to-optimism/) - Building Anchorage: Alutiiq design is a tribute to optimism What: Afognak Native Corp.'s Alutiiq Center. The five-story Class A office building is 71,200 square feet and is valued at $11.4 million, according to an Anchorage permitting official. Where: 3909 Arctic Boulevard, in Midtown. Who: Venture Development Group is organizing construction. The architect is Anchorage firm - [Brother Francis Shelter builds new facility](https://www.neeserinc.com/news/brother-francis-shelter-builds-new-facility/) - Brother Francis shelter builds new facility Old mural ties modern building to stories of past Two homeless men at Brother Francis Shelter painted an enormous, engaging and stylized mural right on the dining room wall 17 years ago. It showed Jesus standing with Alaskans in a breadline. Construction workers recently cut out that hunk of - [Alaska Business Monthly reports on Neeser Construction's Winning team, quality, and recent projects.](https://www.neeserinc.com/news/alaska-business-monthly-reports-on-neeser-constructions-winning-team-quality-and-recent-projects/) - In nearly 30 years of operations, Neeser Construction Inc. has never gone over budget nor has it ever been late on a project, according to President Jerry Neeser. The company has never been taken to court for poor quality nor has a lien ever been taken out on the group. It is a boast few - [Alaska Business Monthly Neeser Construction Inc. listed as #11 of the top 49 Alaska Businesses.](https://www.neeserinc.com/news/alaska-business-monthly-neeser-construction-inc-listed-as-11-of-the-top-49-alaska-businesses/) - Every October Alaska Business Monthly salutes the top 49 Alaskan-Owned and operated businesses in the state, based on gross revenues for the previous year. Here we have listed 2001 - 2002 revenues in millions of dollars. #11 - Neeser Construction, Inc. Employees: 445 Year Established: 1975 Rank Previous Year: 19 Change 31.01% from 2000. MAIN - [Jerry Neeser of Neeser Construction featured in Alaska Men in Business, 2002 ed.](https://www.neeserinc.com/news/jerry-neeser-of-neeser-construction-featured-in-alaska-men-in-business-2002-ed/) - Jerry Neeser President Neeser Construction Inc. Anchorage TYPE OF BUSINESS: General contractor EDUCATION: High School, U.S. Marine Corps, various construction courses, knocks of life COMMUNITY/CIVIC ACTIVITIES: Associated General Contractors of Alaska member MARITAL/FAMILY STATUS: Divorced; two grown children, two adolescent children BUSINESS PHILOSOPHY Guiding principle in business: Be honest and KIS (keep it simple). Best ## Testimonials - [Yukon Flats School District](https://www.neeserinc.com/testimonials/yukon-flats-school-district/) - To Whom it May Concern, Unalakleet/Neeser Construction has recently completed a 20,000 s.f. elementary school addition (3.3 million) for the Yukon Flats School District in Venetie, Alaska. Unalakleet/Neeser is currently working on a new 10,000 s.f. (2.2 million) combined school facility in Stevens Village, Ak. The district has worked with this contractor for approximately 1.5 - [Military Entrance Processing Station](https://www.neeserinc.com/testimonials/military-entrance-processing-station/) - To Whom It May Concern: Neeser Construction, Inc. recently completed the new Military Entrance Processing Station located At 1515 "C" Street in Anchorage, Alaska. This design/build project for our Headquarters located in North Chicago, Illinois, was funded through and coordinated with the General Services Administration tn Auburn, Washington. Despite inherent problems associated with a multi-governmental - [Veterans Administration Outpatient Clinic](https://www.neeserinc.com/testimonials/veterans-administration-outpatient-clinic/) - Dear Mr. Neeser: I want to personally thank you and the staff of Neeser Construction, Inc. for the utmost cooperation and quality workmanship over the past fifteen months in the construction of the Anchorage VA Outpatient Clinic/Regional Office. I still marvel at the timely completion of the project given all the constraints that you had - [Anchorage City Hall](https://www.neeserinc.com/testimonials/anchorage-city-hall/) - Dear Mr. Neeser, I would like to extend a personal "THANKS" for a job well done on the new City Hall construction project. The ability of your company to perform was noticed right from the beginning during phase onn to move the centralized computer system to an offsite location. Neeser Construction came through by completing - [Bering Strait School District](https://www.neeserinc.com/testimonials/bering-strait-school-district/) - Dear Gerald: In response to your request for this letter we are pleased to take this opportunity to review your performance on the Unalakleet Elementary School Project. The project was a design/build contract for design and construction of a single story wood frame building, The building consisted of 10,000 square feet of floor area divided - [AAFES Joint Military Mall](https://www.neeserinc.com/testimonials/aafes-joint-military-mall/) - To All Interested Parties: In September 1999, the Army and Air Force Exchange Service (AAFES) and the Defense Commissary Agency (DeCA) opened a $35 Million joint shopping center on Elmendorf Air Force Base, Anchorage, Alaska. This exceptional (330,000 SF) facility is one of the largest joint projects constructed to date by the two organizations. It - [Public Health Lab & Medical Examiners Facility](https://www.neeserinc.com/testimonials/public-health-lab-medical-examiners-facility/) - Gentlemen: I would like to Praise and extend a personal THANKS to Neeser Construction for a job well done on the Public Health Lab and Medical Examiners Facility. This was a very complicated project and your company's performance made a great deal of difference to it's success. I would also like to commend your company - [Anchorage Downtown Fire Station](https://www.neeserinc.com/testimonials/anchorage-downtown-fire-station/) - Dear Mr. Gary Donnelly: We are very pleased with the new 29,700 SF Downtown Fire Station Complex, with its modern design, durable building materials and high tech operational signaling/communication systems. We wish to thank you for the highly skilled team that worked on the building, including Mark Haas, Jim Hoglund, Ken Burkhart and the subcontractors - [South Anchorage High School](https://www.neeserinc.com/testimonials/south-anchorage-high-school/) - Yak'ei Award of Excellence South Anchorage High School was the first new high school within the Anchorage School District in nearly 30 years. It was designed for education in the 21st century which is reflected in its forward-thinking, youthful appearance. The 50 acre campus is on a wooded site with an 80 foot slope - [The Altuiiq Center](https://www.neeserinc.com/testimonials/the-altuiiq-center/) - The American Institute of Architects AIA Alaska 2007 Merit Award This award is presented for EXCELLENCE IN ARCHITECTURE Project: Afognak Native Corporation - Alutiiq Center Owner: Venture Development Group Architect: kpb architects Contractor: Neeser Construction -Garrett H. Maupin, AIA Alaska Chapter President, Afognak Native Corporation - Alutiiq Center - [McKinnell House / Cares for Kids](https://www.neeserinc.com/testimonials/mckinnell-house-cares-for-kids/) - The Salvation Army SAFE Campus Dear Gary, What a privilege it is to provide a letter of support to include with Neeser Construction's submission to the Design Build Institute of America, recognizing the partnership between Neeser and The Salvation Army to complete the design-build SAFE Campus project in Anchorage. The Salvation Army first began dreaming - [Primary Care Center I and II](https://www.neeserinc.com/testimonials/primary-care-center-i-and-ii/) - Dear Royal: I am writing to commend you on the successful completion of construction of the Primary Care Center I and II. It has been a pleasure working with you and your team on this project primarily due to the dedication you have to the practice of quality construction. Glenn, Steve, Bill, Pat, and yourself - [State of Alaska Public Health Laboratory and Medical Examiner's Facility](https://www.neeserinc.com/testimonials/state-of-alaska-public-health-laboratory-and-medical-examiners-facility/) - Livingston Slone, Inc. Dear Jerry, I write to commend Neeser Construction, Inc. on a job well done. The referenced project was a very complex building type on a tight construction schedule. The 33,000 sf, $18M project was completed on-time and to a high standard of quality, Neeser Construction, Inc (NCI) was the general contractor and - [Primary Care Center Phase III & Parking Garage](https://www.neeserinc.com/testimonials/primary-care-center-phase-iii-parking-garage/) - Dear Mr. Neeser: I would like to thank you and your team for the great work on the PCC expansion project. This was both a fast paced and challenging project that your team preformed excellently. There were many hurdles that could have slowed your team down but they never skipped a beat completing the project - [Lower Yukon School District](https://www.neeserinc.com/testimonials/lower-yukon-school-district/) - To Whom It May Concern: At the request of Cal Myrick of Neeser Construction, Inc. (Neeser), I am writing this letter of recommendation based on my working relationship with Cal on the construction of new schools in Togiak and Hooper Bay, Alaska valued at approximately 48 million dollars. I can attest to Neeser Construction Inc., - [Dena’ina Civic and Convention Center](https://www.neeserinc.com/testimonials/denaina-civic-and-convention-center-2/) - National Design-Build Awards Jury: Anchorage owes a big thank you to Jerry Neeser and the entire Neeser Construction, Inc., (NCI) Design/Build team for their outstanding effort to help bring Alaska's convention capability into the 21st century. Without NCI and its team of design professionals, this might still be a vision for the future. The completion - [Enterprise Rent-A-Car](https://www.neeserinc.com/testimonials/enterprise-rent-a-car/) - Dear Evaluation Committee: This letter is in reference to the Car Rental Center in Anchorage Alaska. This facility was built a year ago and is a masterpiece of architecture for Alaska. Before the facility was built, our customers had to walk to their cars in inclement weather, dragging their bags through the snow and slush. - [Alaska Psychiatric Institute Hospital](https://www.neeserinc.com/testimonials/alaska-psychiatric-institute-hospital/) - I worked with Neeser Construction, Inc. (NCI) over a peiod of almost three years during the design,construction and start-up of the State of Alaska's replacement of its only public psychiatric hospital (2002-2005). At the time, I was employed by the Alaska Department of Transportation & Public Facilities and served as the State's Project Manager. NCI - [Anchorage SAVE School](https://www.neeserinc.com/testimonials/anchorage-save-school/) - Dear Gary: Now that all the dust has settled and the school year is under way, I thought I would take a moment to comment about Neeser Construction’s performance on the S.A.V.E. II contract. As a Construction Project Manager for the Anchorage School District I have to deal with a wide variety of contractors. I - [Anchorage Convention & Visitors Bureau (Dena'ina Center)](https://www.neeserinc.com/testimonials/anchorage-convention-visitors-bureau-denaina-center/) - Dear National Design-Build Awards Jury: In 1998, a feasibility study was conducted that determined Anchorage's need for a larger convention center to continue the community's economic growth. The study concluded that without the facility Anchorage would reach capacity in its ability to generate economic growth from convention trade by 2005. Encouraged by the conclusions of - [Chuck E. Cheese](https://www.neeserinc.com/testimonials/chuck-e-cheese/) - To Wham It May Concern: Neeser Construction Inc. has just completed a substantial remodeling project for us and I am highly pleased. The job was finished ahead of schedule; the quality of work was excellent; and the job was completed on budget. With one exception I found their subcontractor selections to be quite good. Neeser's - [Wang Laboratories](https://www.neeserinc.com/testimonials/wang-laboratories/) - Dear Mr. Neeser, Your recent remodeling to the first floor of our F.S.S. Building was a complete success. The Wang Laboratories are more than satisfied-with the end results. The quality of the work is superb. We feel your timely scheduling and fast track handling of this project could not be surpassed. This professionalism is the - [Wang Laboratories Inc.](https://www.neeserinc.com/testimonials/wang-laboratories-inc/) - Dear Mr. Neeser: The Anchorage Branch of Wang Laboratories, Inc. would like to commend you and your crew for an excellent job recently completed at our new facility. The professionalism and courtesy projected by your organization was most impressive. Not only was the entire job completed in a most timely manner, it was done exactly - [Dena'ina Civic and Convention Center](https://www.neeserinc.com/testimonials/denaina-civic-and-convention-center-4/) - National Design-Build Awards Jury: Anchorage owes a big thank you to Jerry Neeser and the entire Neeser Construction, Inc., (NCI) Design/Build team for their outstanding effort to help bring Alaska's convention capability into the 21st century. Without NCI and its team of design professionals, this might still be a vision for the future. The completion - [Yukon Flats School District](https://www.neeserinc.com/testimonials/yukon-flats-school-district-2/) - To Whom it May Concern, Unalakleet/Neeser Construction has recently completed a 20,000 s.f. elementary school addition (3.3 million) for the Yukon Flats School District in Venetie, Alaska. Unalakleet/Neeser is currently working on a new 10,000 s.f. (2.2 million) combined school facility in Stevens Village, Ak. The district has worked with this contractor for approximately 1.5 years - [Dena'ina Civic and Convention Center](https://www.neeserinc.com/testimonials/denaina-civic-and-convention-center-5/) - Dear Jerry, What a welcome addition to our Anchorage business district! My husband and I truly enjoyed ourselves Sunday aternoon at the opening of the Dena'ina Civic and Convention Center. I was impressed with the beautiful design and the well-crafted feel of the facility. I applaud you on the timely completion and for being within - [Denali Professional Building](https://www.neeserinc.com/testimonials/959/) - Dear Mr. Neeser: Neeser Construction Inc., has just recently completed designing and constructing a 12,600 square foot class A office building for the Denali Professional Building Partnership. As one of the General Partners I can say it has been a pleasure dealing with Neeser Construction and their crews, throughout the entire project. From the first - [Foussard EconLab](https://www.neeserinc.com/testimonials/963/) - To Whom It May Concern: We became acquainted with Neeser Construction Company, of Anchorage, Alaska during 1984, when we were in the process of developing a project for two of the premiere hotels in Anchorage. We subsequently entered into a business arrangement with Neeser Construction where we provided the design work on a special construction - [Anchorage Cooperative Linen Service](https://www.neeserinc.com/testimonials/foussard-econ-lab/) - Dear Gerry : Now that we have the opportunity to sit back and review the activities of the past few months, we would like to take the opportunity to express our gratitude for your commitment with the reconstruction of the Anchorage Cooperative Linen Service facility. As we have the opportunity to discuss this project during - [GCI Northern Lights](https://www.neeserinc.com/testimonials/interior-solutions-group-inc/) - Dear Mr. Neeser: On behalf of Interior Solutions Group, Inc. I would like to express how much we thoroughly enjoyed working with your staff on the new GCI Northern Lights Retail Facility. The professional team effort of your staff greatly attributed to the success of the interior design portion of this project. We would like - [Togiak School & Hooper Bay](https://www.neeserinc.com/testimonials/971/) - To Whom It May Concern: At the request of Cal Myrick of Neeser Construction, Inc. (Neeser), I am writing this letter of recommendation based on my working relationship with Cal on the construction of new schools in Togiak and Hooper Bay, Alaska valued at approximately 48 million dollars. I can attest to Neeser Construction Inc., - [IBM Office](https://www.neeserinc.com/testimonials/ibm-office/) - Just a note to formally commend you on a job well done in our Anchorage facility. Not only was the workmanship of the highest quality, the coordination and cooperation between you and your subs and the IBM personnel was outstanding. A renovation such as this – in totally occupied space with a "business as usual" - [IBM Remodel](https://www.neeserinc.com/testimonials/ibm-remodel/) - TO WHOM IT MAY CONCERN: Neeser Construction, located at 2501 Blueberry, Anchorage, Alaska, was the General Contractor on a remodel job for IBM during 1984 in our building located at 2525 "C" Street. The total contract sum was in excess of $650,000. All work performed by and controlled by Neeser Construction was completed in the - [Juneau Office Building](https://www.neeserinc.com/testimonials/juneau-office-building/) - To Whom It May Concern: Mr. Gerald E. Neeser, President of Neeser Construction, Inc., requested a letter from us outlining the performance of his company when it served as General Contractor for our 1983 building project. Let me begin by saying that we reviewed many general contractors prior to selecting Neeser Construction. Three primary reasons - [Juneau Building Construction](https://www.neeserinc.com/testimonials/juneau-building-construction/) - TO WHOM IT MAY CONCERN As an architect based in Juneau, Alaska my firm has worked closely with Neeser Construction Inc. on two projects in Juneau totalling in excess of three million dollars. Both projects were in the design/build format. Gerald Neeser has demonstrated an ability to work in harmony with the Architect, so as - [Anchorage Tower](https://www.neeserinc.com/testimonials/anchorage-tower/) - Dear Jerry: Now that we have had the opportunity to review the activities that took place over the winter, we would like to take the opportunity to express our gratitude for your commitment with the rehabilitation of the Anchorage Tower. As discussed in the past, we are grateful for the commitment your company made in - [Alaska VA Clinic](https://www.neeserinc.com/testimonials/alaska-va-clinic/) - Dear Jerry: From start to finish, your performance on the Alaska VA Clinic deal made the difference. You wear the hats of both developer and builder with equal perfection. Any false step on this project would have been disastrous. The deadlines were tight and the political issues were enormous, but your expertise won the day. - [Army and Air Force Exchange Service Military Mall](https://www.neeserinc.com/testimonials/army-and-air-force-exchange-service-military-mall/) - To Whom It May Concern: Our company, URS Greiner Woodward Clyde, is the Owner’s Representative for Design-Build projects being constructed by the Army and Air Force Exchange Service (AAFES). AAFES are the retailers for most consumer products and services provided to the active and retired families in US military communities worldwide. Neeser Construction recently completed - [Dormitory Phase II Clear Air Force Station, Alaska](https://www.neeserinc.com/testimonials/dormitory-phase-ii-clear-air-force-station-alaska/) - Dear Sirs: I would like to take this opportunity to commend you for your outstanding performance on Contract DACA 85-93-C-0046, Alter Dormitory Phase II, (Bldg 203) Clear Air Force Station, Alaska. The outstanding performance rating received by your company is well deserved. I wish to thank each and every employee of the Gaston & Associates - [Lousaac-Sogn Building](https://www.neeserinc.com/testimonials/lousaac-sogn-building/) - TO WHOM IT MAY CONCERN: This letter will serve to introduce Jerry Neeser, general contractor and owner of Neeser Construction, Inc. Our company contracted Neeser Construction to construct a commercial office building on the corner of Ninth Avenue and N Streets in Anchorage. In addition, Mr. Neeser's company remodeled our offices in the Lousaac-Sogn building - [Anchorage Car Rental Center](https://www.neeserinc.com/testimonials/anchorage-car-rental-center/) - Dear Committee Members: It is with great pleasure and enthusiasm that we recommend Neeser Construction, Inc. as the recipient of your design-build award for its construction of the rental car consolidated facility at Anchorage International Airport. The design of the facility with its open expanse of lobby space captures the spirit of Alaska and complements - [Alaska Psychiatric Institute Hospital](https://www.neeserinc.com/testimonials/alaska-psychiatric-institute-hospital-2/) - Dear Jerry: I would like to extend my thanks to Neeser Construction for a job well done on the Alaska Psychiatric Institute Replacement Facility. This design build project had diverse needs and complex challenges. The professional manner in which your design-build team responded to the challenges contributed highly to the success of the project. The - [Air Land Transport at East 79th and Petersburg](https://www.neeserinc.com/testimonials/air-land-transport-at-east-79th-and-petersburg/) - TO WHOM IT MAY CONCERN: Neeser Construction and staff designed and built for Corporate Leasing & Investment an office/warehouse complex leased to Air Land Transport at East 79th and Petersburg Sts. When we contracted Neeser Construction, Jerry Neeser owner, promised a turn key project and that is exactly what we received and by the completion - [Primary Care Clinic](https://www.neeserinc.com/testimonials/primary-care-clinic/) - Dear Jerry, Since NBBJ is a large Architectural Firm we have the opportunity to work with some of the biggest and most qualified contractors in the country. We do more Healthcare Architecture then any other firm in the country. Through the construction process we often spend large amounts of time trying to assure a level - [Nelson Island High School](https://www.neeserinc.com/testimonials/nelson-island-high-school/) - Neeser Construction, Inc. recently completed the General Construction for Nelson Island High School - Wind Damage Repair. The work progressed in a timely manner and was completed on schedule. The Contractor conducted his business in a professional manner at all times. We would welcome the opportunity to work with Mr. Neeser on future construction projects. - [Southcentral Foundation Expansion](https://www.neeserinc.com/testimonials/1100/) - Dear Mr. Neeser: I would like to thank you and your team for the great work on the PCC expansion project. This was both a fast paced and challenging project that your team preformed excellently. There were many hurdles that could have slowed your team down but they never skipped a beat completing the project - [Rudokof Apartments](https://www.neeserinc.com/testimonials/rudokof-apartments/) - Dear Jerry, I'd like to express my appreciation for a job well done on the Rudokof Circle Office Condominiums. I'm very pleased with the final product and appreciate your follow-through in getting the building completed in a reasonable length of time. Sincerely, Paul D. Selberg, AZA Architect/Planner -Paul D. Selberg, AZA Architect/Planner, Rudokof Circle Office - [Rudokof Circle Commons](https://www.neeserinc.com/testimonials/rudokof-circle-commons/) - Dear Jerry, I'd like to express my appreciation for a job well done on the Rudokof Circle Office Condominiums. I'm very pleased with the final product and appreciate your follow-through in getting the building completed in a reasonable length of time. Sincerely, Paul D. Selberg, AZA Architect/Planner -Paul D. Selberg, AZA Architect/Planner, Rudokof Circle Office - [Excellence in Safety Award](https://www.neeserinc.com/testimonials/excellence-in-safety-award/) - Dear Mr. Field, Senco Alaska would like to congratulate you and your company on your nomination for the Excellence in Safety Award at this year's AGC Conference. We applaud your hard work and dedication to the construction industry, and this prestigious award is a reflection of your efforts. Being a family owned and operated business - [South Anchorage High School](https://www.neeserinc.com/testimonials/south-anchorage-high-school-2/) - South Anchorage High School was the first new high school within the Anchorage School District in nearly 30 years. It was designed for education in the 21st century which is reflected in its forward-thinking, youthful appearance. The 50 acre campus is on a wooded site with an 80 foot slope drop. The site provides all - [South Anchorage High School](https://www.neeserinc.com/testimonials/south-anchorage-high-school-3/) - Neil, I want to take this opportunity to thank you for the extra effort put forth by Neeser Construction and Megawatt Electric to bring resolution to the issues we were experiencing with the installed intercom system at South Anchorage High School. Tony Gongliewski and Dennis Hebert of Megawatt Electric effectively led the effort with professionalism, - [S.A.V.E School](https://www.neeserinc.com/testimonials/s-a-v-e-school/) - Dear Jerry: I want to express my personal appreciation for your participation at the SAFE Campus Dedication Celebration last week. I was most humbled by your warm words of congratulations and most generous support for the ministry of The Salvation Army in serving the people of Alaska. Working with the Neeser team to help bring ## Categories - [In Progress](https://www.neeserinc.com/category/in-progress/) - [Schools](https://www.neeserinc.com/category/schools/) - [Public Facilities](https://www.neeserinc.com/category/public-facilities/) - [Medical](https://www.neeserinc.com/category/medical/) - [Offices](https://www.neeserinc.com/category/offices/) - [Commercial / Multiplex Housing](https://www.neeserinc.com/category/commercial-multiplex-housing/) - [Retail](https://www.neeserinc.com/category/retail/) - [Civil](https://www.neeserinc.com/category/civil/) - [Wharehouse / Light Industrial](https://www.neeserinc.com/category/wharehouse-light-industrial/)