Valley Medical Road Upgrades

C- Scope of work includes a new intersection with traffic signals with provision for left turn lane from Talbort Rd S., north bound onto N. Campus Rd and left turn lane from N. Campus Rd onto Talbot Td S. going North Bound, designated bike lane and dedicated right turn lanes on new North Rd and Talbot Rd S., relocate one existing power pole at new intersection which serves Valley Medical Pavilion, Bid Coument A. Site improvement also includes repave providing accessible curb ramps, new crosswalk with dedicated signals, new bus stop and new concrete sidewalks. Any relocation of existing utility within scope of work area to be coordinated with local utility company providing services.
D- The scope pf work includes relocate a section of existing N. Campus Rd to align with S. 177th St between the new Talbot Rd S. intersection (Bid package C) and the new Valley Medical Pavilion (Bid package A) Site improvement includes providing new concrete sidewalks, accessible curb ramps, new crosswalk, new parking re-stripe at existing VPCN parking lot