Willow House

Clear grub and remove former development conditions; installation of deep utilities, and fire hydrants with water lines from the water main; excavation of the building footprint and removal
of unsuitable soils; back fill with usable soils to the building foundation level; excavation of the driveway entrance, onsite driveways/roadways and parking lot area to the required depth and
back filling with NSF material; responsible for the preparation and paving of the access road; and pre-construction site grading