This project consists of civil site work rleated to the demolition of paving, sidwalk, curb and gutter, storm drainage system and site lighting. The work shall include removing & replacing a portion of subgrade, as outlined in the contract documents, moving and replacing out buildings, so as to accomplish the work, removing and replacing a retaining wall and reconfiguring the rear loading ramp.