Civil
4th Ave. Signal & Lighting Phase 2
Anchorage, Alaska

Status: Completed July 18, 2023
Consisting of approximately 6,000 S.Y. of Sidewalk and Concrete Apron Removal and Replacement; 30 each of Curb Ramps; 3,400 L.F. of Curb and Gutter Removal and Replacement; 1,900 Tons of A.C. Pavement; 9,000 S.Y. of Pavement Removal; 9 Catch Basins; 10 Storm Drain Manholes; 1,000 L.F. of Storm Pipe Removal and Replacement; 3 Traffic Signals; 45 Pedestrian Electroliers;
Project Details
AMATS: Chugiak Foothills Connector, Ph. II
Anchorage, Alaska

Status: Completed July 13, 2023
This federally funded project will construct a multi-use path along Tudor Road between Regal Mountain Drive and Campbell Airstrip Road. Project work includes grading, pathway, boardwalk and signing.
Project Details
Image Drive-Reflection Drive
Anchorage, Alaska

Status: Completed October 12, 2021
Consisting of approximately 17,085 C.Y. of Excavation; 27,237 Tons of Classified Fill and Back fill; 2,710 L.F. of Curb and Gutter Removal; 6,871 S.Y. of Pavement Removal; 820 Tons A.C. Pavement; 2,713 L.F. Curb and Gutter Installation; 7 Curb Ramp Installations; 63,000 S.F. Insulation Installation (R-9); 4,950 S.F. Insulation Installation (R-4.5); 913 S.Y. P.C.C. Sidewalk
Project Details
Camp K Upper Development
Cooper Landing, Alaska

Status: Completed July 31, 2021
Civil construction for a new septic system and site work for 3 new cabins, a new bathhouse and nature center buildings including piling.
Project Details
TSAIA Runway 25R
Anchorage, Alaska

Status: Completed July 08, 2021
This federally funded project will construct improvements to drainage around the east Runway Safety Area (RSA) of Runway 7L/25R, prevent ponding east of the existing tug road which is a wildlife attractant, reconstruct the RSA to meet FAA standards, remove and install FAA Fiber Optic duct bank, remove obstructions, and install fencing.
Project Details
4th Ave. Signal & Lighting
Anchorage, Alaska

Status: Completed May 07, 2021
Consisting of approximately 1,657 S.Y. of Sidewalk and Concrete Apron Removal and Replacement; 21 curb ramps; 1,232 L.F. of Curb and Gutter Removal and Replacement; 1,047 Tons of A.C. Pavement; 3,825 S.Y. of Pavement Removal; 6 Catch Basins; 1 Storm Drain Manhole; 188 L.F. of Storm Pipe Removal and Replacement; Replacement of 2 complete signal systems;
Project Details
Willow House
Anchorage, Alaska

Status: Completed October 07, 2020
Clear grub and remove former development conditions; installation of deep utilities, and fire hydrants with water lines from the water main; excavation of the building footprint and removal of unsuitable soils; back fill with usable soils to the building foundation level; excavation of the driveway entrance, onsite driveways/roadways and parking lot area to the required
Project Details
Fish Creek Trail Rehab
Anchorage, Alaska

Status: Completed June 30, 2020
Federally funded contract will reconstruct the Fish Creek Trail to include trail rehabilitation, bridge and retaining wall replacement, illumination and signage
Project Details
Valley Medical Road Upgrades
Renton, Washington

Status: Completed September 30, 2019
C- Scope of work includes a new intersection with traffic signals with provision for left turn lane from Talbort Rd S., north bound onto N. Campus Rd and left turn lane from N. Campus Rd onto Talbot Td S. going North Bound, designated bike lane and dedicated right turn lanes on new North Rd and Talbot Rd S., relocate one existing power pole at new intersection which ...
Project Details
Glenn Highway Muldoon Road Interchange
Anchorage, Alaska

Status: Completed September 30, 2018
This state funded project will reconstruct the existing Glenn-Muldoon partial cloverleaf interchange into a diverging diamond configuration including reconstruction of the Glenn Hwy on/off ramps and reconstruction of Muldoon Road from Boundary Ave. to Golden Bear Drive. Associated improvements include new pedestrian pathways, illuminations, noise walls, water line relo
Project Details
HSIP Anchorage Area Safety
Anchorage, Alaska

Status: Completed June 01, 2018
This federally funded contract will provide intersection safety improvements at numerous locations throughout Anchorage. Work includes channelization and signing, curb bulb installations, sight distance improvements, and signal pole/signal arm relocation in addition to repaving.
Project Details
Trunk Road Extension South Phase 2
Palmer, Alaska

Status: In Progress
Construct the second phase of Trunk Road South from the existing asphalt south of the new roundabout to the existing Nelson road widening just before Fetlock Drive intersection. Grading, drainage, guardrail, paving, and striping, and other miscellaneous items of work will be done as necessary
Project Details
Grass Creek North Phase I & Phase II
Anchorage, Alaska

Status: Completed June 16, 2016
Associated civil work for Phases I on the corner of Creekside Center Drive and Muldoon Road for the construction of eight (8) tri-plex and two (2) four-plex townhome style buildings, one (1) three story twenty-unit multifamily building for a total of fifty-two (52) units. Phase II starts Spring 2016
Project Details
TIA Taxiway Y&K Safety Area Widening
Anchorage, Alaska

Status: Completed June 15, 2016
This federally funded project will widen safety areas for Taxiways Y and K to meet FAA standards for ADG VI aircraft.
Project Details
Fish Creek Sewer Rehab Ph. III
Anchorage, Alaska

Status: Completed May 15, 2016
This contract consists of the removal of existing 8" concrete (CN) sewer pipe and replacement with approximately 416 linear feet of Contractor furnished and installed 8-inch PVC pipe, and rehabilitation of 5 CMP manholes with contractor furnished and installed fiberglass manhole inserts, frames, and watertight covers. The work also includes installation and removal
Project Details
326 L St. Parking Lot
Anchorage, Alaska

Status: Completed November 05, 2015
Soil remediation, building demolition, and paving of new parking lot for downtown Anchorage
Project Details
Ridgeline Terrace
Anchorage, Alaska

Status: Completed September 30, 2015
associated civil work for the construction of fourteen (14) townhome style buildings for a total of seventy (70) units and one (1) 5,200 square foot community building located on Mountain View Drive in Anchorage, Alaska.
Project Details
Eagle River Elementary School Site Improvement
Eagle River, Alaska

Status: Completed August 12, 2015
This project consists of civil site work rleated to the demolition of paving, sidwalk, curb and gutter, storm drainage system and site lighting. The work shall include removing & replacing a portion of subgrade, as outlined in the contract documents, moving and replacing out buildings, so as to accomplish the work, removing and replacing a retaining wall and reconfiguring
Project Details
Aero Parking
Seattle, Washington

Status: Completed July 27, 2016
The project is located 2 miles south of the Seattle-Tacoma International Airport on the north side of 208th Street, west of the International Blvd. in the City of Sea Tac, Washington. Project consists of ground lease improvements to create a 842 stall valley parking lot situated on two land parcels containing 213,179 square feet.
Project Details