Civil
Glenn Highway Muldoon Road Interchange
Anchorage, Alaska

Status: Completed September 30, 2018
This state funded project will reconstruct the existing Glenn-Muldoon partial cloverleaf interchange into a diverging diamond configuration including reconstruction of the Glenn Hwy on/off ramps and reconstruction of Muldoon Road from Boundary Ave. to Golden Bear Drive. Associated improvements include new pedestrian pathways, illuminations, noise walls, water line relo
Project Details
HSIP Anchorage Area Safety
Anchorage, Alaska

Status: Completed June 01, 2018
This federally funded contract will provide intersection safety improvements at numerous locations throughout Anchorage. Work includes channelization and signing, curb bulb installations, sight distance improvements, and signal pole/signal arm relocation in addition to repaving.
Project Details
Trunk Road Extension South Phase 2
Palmer, Alaska

Status: In Progress
Construct the second phase of Trunk Road South from the existing asphalt south of the new roundabout to the existing Nelson road widening just before Fetlock Drive intersection. Grading, drainage, guardrail, paving, and striping, and other miscellaneous items of work will be done as necessary
Project Details
Grass Creek North Phase I & Phase II
Anchorage, Alaska

Status: Completed June 16, 2016
Associated civil work for Phases I on the corner of Creekside Center Drive and Muldoon Road for the construction of eight (8) tri-plex and two (2) four-plex townhome style buildings, one (1) three story twenty-unit multifamily building for a total of fifty-two (52) units. Phase II starts Spring 2016
Project Details
TIA Taxiway Y&K Safety Area Widening
Anchorage, Alaska

Status: Completed June 15, 2016
This federally funded project will widen safety areas for Taxiways Y and K to meet FAA standards for ADG VI aircraft.
Project Details
Fish Creek Sewer Rehab Ph. III
Anchorage, Alaska

Status: Completed May 15, 2016
This contract consists of the removal of existing 8" concrete (CN) sewer pipe and replacement with approximately 416 linear feet of Contractor furnished and installed 8-inch PVC pipe, and rehabilitation of 5 CMP manholes with contractor furnished and installed fiberglass manhole inserts, frames, and watertight covers. The work also includes installation and removal
Project Details
326 L St. Parking Lot
Anchorage, Alaska

Status: Completed November 05, 2015
Soil remediation, building demolition, and paving of new parking lot for downtown Anchorage
Project Details
Ridgeline Terrace
Anchorage, Alaska

Status: Completed September 30, 2015
associated civil work for the construction of fourteen (14) townhome style buildings for a total of seventy (70) units and one (1) 5,200 square foot community building located on Mountain View Drive in Anchorage, Alaska.
Project Details
Eagle River Elementary School Site Improvement
Eagle River, Alaska

Status: Completed August 12, 2015
This project consists of civil site work rleated to the demolition of paving, sidwalk, curb and gutter, storm drainage system and site lighting. The work shall include removing & replacing a portion of subgrade, as outlined in the contract documents, moving and replacing out buildings, so as to accomplish the work, removing and replacing a retaining wall and reconfiguring
Project Details
Aero Parking
Seattle, Washington

Status: Completed July 27, 2016
The project is located 2 miles south of the Seattle-Tacoma International Airport on the north side of 208th Street, west of the International Blvd. in the City of Sea Tac, Washington. Project consists of ground lease improvements to create a 842 stall valley parking lot situated on two land parcels containing 213,179 square feet.
Project Details