Black Rapids Ski Chalet

SATOC awarded to Neeser Paug Vik, JV, LLC under the SBA 8(a) program. Design-build and Design-Bid-Build construction (vertical and horizontal), for projects located primarily throughout Alaska & Hawaii. Demolish existing wood framed structure, Northern Warfare Training Center, Black Rapids Training Site, Alaska. Bldg. 2032. Prepare site to for new structural building slab on grade and to promote proper drainage away from new building. Form and place reinforced slab on grade foundation. Assemble prefabricated metal structure with insulated metal panels. Structure to include observation mezzanine, windows to observe the ski area, arctic entries and kitchenette. Reconnect utilities.