In Progress
The Marlette
Carson City, Nevada

Status: In Progress
140-unit, garden-style, multifamily development. The complex is being developed on a 6.1-acre site. The community will feature 10 two-story buildings, each with 14 units, a 3,000 square-foot clubhouse, leasing office, fitness center, dog park, a playground, and a swimming pool area complete with cabanas, firepit seating, and an outdoor kitchen for resident use
Project Details
Missile Field 4 Infrastructure
Fort Greely, Alaska

Status: In Progress
This project is for the construction of the FTG218D MF4 Construction Package #04 (CP#04) which includes all of the infrastructure associated with Missile Field 4 (excluding MEB 4) to include; SILO Liners, SILO Foundations, SIV Foundations, Utilidors and associated piping. A and B shielded power duct bank and cabling, A&B communications duct bank and cabling, all utility...
Project Details
4th Ave. Signal & Lighting Phase 2
Anchorage, Alaska

Status: In Progress
Consisting of approximately 6,000 S.Y. of Sidewalk and Concrete Apron Removal and Replacement; 30 each of Curb Ramps; 3,400 L.F. of Curb and Gutter Removal and Replacement; 1,900 Tons of A.C. Pavement; 9,000 S.Y. of Pavement Removal; 9 Catch Basins; 10 Storm Drain Manholes; 1,000 L.F. of Storm Pipe Removal and Replacement; 3 Traffic Signals; 45 Pedestrian Electroliers;
Project Details
Reno Element Hotel by Marriott
Reno, Nevada

Status: In Progress
The project scope is a new mixed-use ground up Marriott Element Hotel consisting of 170 guestrooms total in 5 stories. The Marriott Element Hotel consists of a meeting room, motion center, dinning/breakfast area, full service kitchen, laundry, rooftop pool, spa with deck and a 1 story adjacent 6,404 SF restaurant.
Project Details
601 West 5th Avenue
Anchorage, Alaska

Status: In Progress
A modernization of, and addition to, the existing Key Bank Plaza Building located at the corner of F Street and 5th Avenue in downtown Anchorage. The project includes the demolition of the north stair and replacement with a new stair and service elevator. New service connections for water, sewer, power and sewer will be added to the building.
Project Details
East 16th Ave Storm Drain Improvements
Anchorage, Alaska

Status: In Progress
Consisting of approximately 2,270 L.F. of Storm Pipe Removal and Replacement; 17 new storm drain structures; 1 Vortechs Model 11000 oil and grit separator; approximately 1,040 tons of Pavement; and other related work.
Project Details
Camp K Upper Development
Cooper Landing, Alaska

Status: In Progress
Civil construction for a new septic system and site work for 3 new cabins, a new bathhouse and nature center buildings including piling.
Project Details
Becharof, Rakof to Chirikof Water Rehab
Anchorage, Alaska

Status: In Progress
decommissioning by combination of removal and abandon in place 303 linear feet (LF) of 6-inch and 8-inch cast iron water main, 571 LF of 8-inch asbestos concrete water main and appurtenances, nine (9) ¾” water services and key boxes, and one fire hydrants; furnish and install approximately 1836 LF of 8-inch polyvinyl chloride (PVC) pipe, nine (9) 1-inch water services,
Project Details
Valley Medical Pavilion
Renton, Washington

Status: In Progress
Construct a 5 story approximately 145,000 sq ft medical office building on the Valley Medical Hospital Campus
Project Details
Aluutiq Aviation Building
Kodiak, Alaska

Status: In Progress
Demolition and disposal of the existing building, slabs and foundations, excluding the costs for hazardous material abatement. Excavation for new foundation, backfill for foundation and preparation for slab, asphalt patching, new 6" water service into the building, trenching for sewer and trench drain/oil water separator system. Concrete, building frame, siding
Project Details
Valley Medical Road Upgrades
Renton, Washington

Status: In Progress
C- Scope of work includes a new intersection with traffic signals with provision for left turn lane from Talbort Rd S., north bound onto N. Campus Rd and left turn lane from N. Campus Rd onto Talbot Td S. going North Bound, designated bike lane and dedicated right turn lanes on new North Rd and Talbot Rd S., relocate one existing power pole at new intersection which ...
Project Details
VMC-D&T Ph2
Renton, Washington

Status: In Progress
The project consists of selective demolition and renovation to the existing IRCU department at the main Valley Medical Center Hospital located in Renton, Washington. The size is approximately 10,000 square feet. The TI scope includes a Hybrid OR suite, a Bi-plane and a Cath Lab with supporting equipment rooms and work rooms. The project also includes two new mechanical
Project Details