In Progress
Edgerton Parks Road & Mountain Trails Drive Upgrade
Mat-Su Valley, Alaska
Status: In Progress
This project is to install new pathway and roadway improvements to improve accessibility near Government Peak Trailhead. The project involves, clearing, grubbing, excavation, import and placement of borrow material, placement and backfill of geotextile, geocell, and geogrid, import and placement of aggregate base and surface courses, placing hot mix asphalt...
Project Details
Campbell Creek Trail & Bridge Improvement Phase 5
Anchorage, Alaska
Status: In Progress
Improvements from 57th Place to Fairbanks spur Trail. Approx 424 SY remove pavement, 660 CY of usable excavation, 620 T of classified back fil Type IIA, 1110 CY classified fill Type III, 80 T leveling course, 225 CY of Riprap Class II, 790 SY of Geo textil, 16 CY of P.C.C. Structures decking, 2 helical pier abutments, 75 CY gabion retaining wall, railing and other related
Project Details
Birch Hill Snowmaking
Fort Wainwright, Alaska
Status: In Progress
By Neeser Paug-Vik, JV under SBA Mentor Protégé agreement. New snowmaking equipment and repairs. The JV teamed with SMI Snowmakers for design and manufacture the tower and gun equipment and supply technical oversight and support for installation and to outsource the pumphouse equipment to Torrent Engineering. Thereafter the owner decided to do all the design so NCI's prior
Project Details
Wasilla Airport – Expand Apron E
Wasilla, Alaska
Status: In Progress
Expand Apron E at the Wasilla Municipal Airport @ approximately 230,000 SF apron.
Project Details
E Smith Road
Mat-Su Valley, Alaska
Status: In Progress
The project is located east of the Old Glenn Highway on East Smith Road Extension beginning at the intersection of North Smith Road and extending approx 4600 ft to the eastern termination at North Kendy Circle and the McRoberts & Matanuska Peak trailhead . To provide improved and safer residential and recreational trailhead access through reconstruction of the existing
Project Details
Missile Field 4 Infrastructure
Fort Greely, Alaska
Status: In Progress
This project is for the construction of the FTG218D MF4 Construction Package #04 (CP#04) which includes all of the infrastructure associated with Missile Field 4 (excluding MEB 4) to include; SILO Liners, SILO Foundations, SIV Foundations, Utilidors and associated piping. A and B shielded power duct bank and cabling, A&B communications duct bank and cabling, all utility...
Project Details
