Medical
USACE COVID-19 Alternate Care Facility
Anchorage, Alaska

Status: Completed April 23, 2020
Convert the Alaska Airlines Arena into an Alternate Care Facility in order to achieve a “sufficiency of care” model meeting critical elements of healthcare for an infectious COVID-19 patient based on requirements of NFPA 99 Space Category 2 (General Care). Category 2 is defined by the NFPA 99 as “activities, systems, or equipment whose failure is likely to cause minor
Project Details
The Children’s Dental Clinic
Anchorage, Alaska

Status: Completed September 11, 2018
This 36 chair children's dental clinic was constructed in the Alaska Native Health Campus in Anchorage, Alaska. The initial concept includes a basement and two upper floors, each projected to be about 18,000 square feet for a total of 54,000 square feet. The basement will include utilities, mechanical and electrical, field storage, bulk storage...
Project Details
SCF 2 North Primary Care Center
Anchorage, Alaska

Status: Completed February 28, 2018
The SCF 2 North Primary Care Clinic Remodel is a two-phase tenant improvement project on the SCF main campus in Anchorage, Alaska. The scope includes approximately 20,000 SF of comprehensive renovation of the second floor of the Primary Care Clinic.
Project Details
ANTHC Patient Housing and Sky Bridge
Anchorage, Alaska

Status: Completed December 28, 2016
Provide materials, tools, equipment, supplies, parts, labor, freight, transportation, mobilization, and demobilization, and supervision necessary to construct a six level, 202 room patient housing unit, and sky bridge to connect the housing unit to the Alaska Native Medical Center.
Project Details
ANTHC Healthy Communities Building Remodel
Anchorage, Alaska

Status: Completed September 01, 2016
Create additional clinical space to meet the needs of ANMC's patient population by remodeling two floors of the Healthy Communities Building to accommodate the growing needs of the Internal Medicine Clinic, Podiatry Clinic, Oncology Clinic, and the Infusion Center.
Project Details
Central Peninsula Hospital Phase V Specialty Clinics Building
Soldotna, Alaska

Status: Completed March 01, 2016
This project consists of approximately 89,000 square feet of new single story construction of a steel framed building to house specialty clinic services for Central Peninsula Hospital.
Project Details
Blood Bank of Alaska
Anchorage, Alaska

Status: Completed December 31, 2015
Approximately 56,500 square foot, 2 story building with the lower level housing the blood processing/laboratory area, the donor area, material receiving, garage and laboratory support. The administration, conference, training, IT and staff areas will be located on a second level.
Project Details
ANTHC Outpatient Surgery Center
Anchorage, Alaska

Status: Completed October 23, 2015
Make tenant improvements (TI) to the Outpatient Surgery Center. Develop the TI with an integrated project delivery team (IPD) consisting of designers and construction contractors.
Project Details
Orthopedic Physicians Alaska Addition and Remodel
Anchorage, Alaska

Status: Completed September 23, 2015
This contract demos and remodels the 26,000 square feet of existing first floor space into a new Ambulatory Surgery Center, with a new ground addition of 2,000 square feet for new Entries, Elevators, and Mechanical space plus a Core & Shell addition of 8,000 square feet (for future TI build out) located on the second floor, over the existing single story wings
Project Details
Central Peninsula Hospital Phase 2A Radiology Department Expansion
Soldotna, Alaska

Status: Completed April 14, 2015
This project consists of 5,900 square feet of new/renovated single story construction of a steel framed building addition to house medical imaging services for the radiology department at the hospital. Site work includes concrete curb, sidewalk asphalt paving and landscaping.
Project Details
Dena’ina Wellness Center
Kenai, Alaska

Status: Completed April 11, 2014
The Dena’ina Wellness Center is a 52,000 square foot outpatient medical clinic located in Kenai, Alaska. The facility, located on a brownfield site in “Old Town” Kenai, is set to achieve LEED Silver certification.
Project Details
ANMC Hybrid Operation Room
Anchorage, Alaska

Status: Completed January 19, 2014
The Hybrid Operating Room Suite was constructed to address the need for performing interventional radiology and angiography procedures. The work consisted of the construction of the Hybrid OR suite, associated equipment and storage rooms, modifications to the existing women's locker room, and hallway modifications within the Alaska Native Medical Center.
Project Details
Alaska Native Medical Center, Radiology Server Room Modification
Anchorage, Alaska

Status: Completed July 24, 2013
1500 square foot construction of a new data center for the Radiology Department located in the basement of the Medical Center. Installation of Data Center specific mechanical and electrical infrastructure components.
Project Details
Norton Sound Regional Hospital
Nome, AK

Status: Completed July 13, 2013
This 154,000 square foot, 14 bed hospital is located on an 8 acre site in Nome, Alaska. Nome is located on the south coast of the Seward Peninsula in the Norton Sound region roughly 140 miles south of the Arctic Circle.
Project Details
Valley Native Primary Care Center
Wasilla, Alaska

Status: Completed September 18, 2012
The Valley Native Primary Care Center in Wasilla, Alaska is an 85,000 square foot, two-story primary care center. The project was funded through a USDA loan. The facility will provide the Mat-Su valley with native health program services negating the need to commute into Anchorage.
Project Details
Pioneer GI Clinic
Anchorage, Alaska

Status: Completed July 02, 2012
Remodel of suite 210 at Alaska Regional Medical Plaza Building
Project Details
Fresenius Medical Care
Anchorage, Alaska

Status: Completed January 01, 2009
The Anchorage Dialysis location is a 20,000 square foot, 6.1 million, Renal Care Dialysis Center is full to the brim with complex and highly technical mechanical and dialysis systems. It also has architectural complexity that creates a signature appearance for the client through intricate detailing of form and finish.
Project Details
Primary Care Center Phase III & Parking Garage
Anchorage, Alaska

Status: Completed July 13, 2008
The Southcentral Foundation’s Primary Care Clinic 3 is located on the Alaska Native Medical Campus in Anchorage, Alaska. PCC 3 is a three-story, 79,000SF facility addition to the two-story, 83,000SF existing facility.
Project Details
Orthopedic Physicians Alaska
Anchorage, Alaska

Status: Completed August 01, 2006
63,396 square foot 3-story medical office building and rehabilitation clinic. Maintained the budget through collaborative Owner and NCI design build team efforts. Tenant improvements were constructed within the occupied building.
Project Details
Dental, Behavioral Health and Optometry Clinic
Anchorage, Alaska

Status: Completed May 07, 2003
NCI was selected for this project because of our strong background in design-build and our long history of successful projects for Southcentral Foundation.
Project Details
Primary Care Center, Phase 1 & 2
Anchorage, Alaska

Status: Completed March 09, 2002
The first phase of the Primary Care Center project involved the fast-track design and construction of a 39,000 sq. ft. facility, completed in just fourteen months. The second phase added a 55,000 sq. ft. concrete and steel structure, connected to the first with a unique “helix roof”.
Project Details
Public Health Lab & Medical Examiners Facility
Anchorage, Alaska

Status: Completed March 15, 2001
This is a 37,000 sq. ft. concrete and steel structure housing extensive environmental health laboratory facilities as well a coroner's lab and servicing area.
Project Details
Alaska Regional Hospital Campus
Anchorage, Alaska

Status: Completed March 02, 2001
NCI has worked with Alaska Regional Hospital to construct new medical office buildings, an operating room for heart surgery, major upgrades to existing facilities, and large-scale renovations to the lobby and hospital suites.
Project Details
Office of Health & Human Services
Anchorage, Alaska

Status: Completed December 11, 1996
This was a new office complex required by GSA for Health and Human Services in Anchorage, Alaska. It consists of a 21,566 sq. ft. wood frame building erected on a 12 inch floating mass slab.
Project Details
Ernie Turner Alcoholism Recovery Center
Anchorage, Alaska

Status: Completed December 02, 1996
NCI completed this design-build project in six months, from design through the final stages of construction. The center is a 13,600 sq. ft., two-story structure on masonry walls.
Project Details
Veterans Administration Outpatient Clinic-Regional Offices
Anchorage, Alaska

Status: Completed December 12, 1991
This project, consisting of approximately 204,000 sq. ft., was a design-build lease-back competition. NCI was awarded the contract in September of 1990. Construction began in April 1991, with completion in December 1991, and utilized fast-track construction methods.
Project Details